My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
3500 - Local Oversight Program
>
PR0545195
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 11:57:15 AM
Creation date
1/23/2020 11:44:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545195
PE
3528
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
02
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 C�rdr�o <br /> San Joaquin County Environmental Health Department ATC <br /> March 22,2013 Shaping the Future <br /> Planning and Permits <br /> In advance of the well destruction activities at the site,Cardno ATC will obtain all necessary permits from the EHD. <br /> Cardno ATC will schedule field personnel and equipment,notify Underground Services Alert to locate underground <br /> utilities as required,and perform other necessary field preparation and job start-up activities. The proposed work <br /> Will be performed under the direction of a California Registered Professional Engineer or Geologist. <br /> Well Destruction Activities <br /> Cardno ATC will properly abandon groundwater monitoring wells MW1, MW2, MW3, MW4,MW5,MW6, MW7,and <br /> MW8. The locations of the groundwater monitoring and remediation well networks are shown on Figure 2. <br /> Wells Abandoned by Over Drilling <br /> The groundwater monitoring wells MW1, MW2,MW4,MW5, and MW8 will be abandoned by over-drilling the casing <br /> and sand pack.A minimum 8-inch diameter hollow-stem auger will be used on MW1, MW2, MW4,and MW5,and a <br /> minimum 10-inch diameter hollow-stem auger will be used on MW8. Once the over-drilling process has been <br /> completed,the boreholes will be backfilled with a neat cement grout slurry mix from the base of the annulus to the <br /> surface using a tremmie pipe. Groundwater displaced to the surface during grout installation shall be pumped out <br /> of the excavation,collected,and containerized for proper disposal. This water will be available for the EHD to <br /> inspect and to verify that the well has been properly destroyed.Any remaining soil voids will be backfilled, <br /> compacted,and resurfaced to match the surrounding surface completion. <br /> Wells Abandoned by Pressure Grouting <br /> Groundwater monitoring wells MW3, MW6,and MW7 will be abandoned via pressure grouting. Prior to the <br /> abandonment for protection of the annular seal at the ground surface,the well boxes and locking plugs will be <br /> removed and a minimum 24-inch diameter hole will be dug out around the well box locations to a depth of <br /> approximately 36 inches. Then the top 2.5 feet of well casing will be cut,with the remaining six-inch exposed <br /> section of casing being affixed to a specialized pressure-grouting tool to deliver and emplace a neat cement grout <br /> slurry under pressure,to fill the casing and filter pack with grout. Once the casing is completely filled,the grout <br /> used to fill the wells will be made to overflow into the excavation to form a minimum 24-inch diameter"mushroom <br /> cap"like seal,with at least 12 inches of neat cement grout poured 6 inches above and 6 inches below the top of the <br /> cut-off casing.Any remaining soil voids will be backfilled compacted and resurfaced to match the surrounding <br /> surface completion. <br /> Report Preparation <br /> Upon completion of the well destruction activities,a summary report will be prepared that will include a description <br /> of all well destruction field activities associated with the site and include records of waste disposal. Cardno ATC will <br /> also submit well destruction logs to the Department of Water Resources. <br /> PROJECTED SCHEDULE <br /> Once approval of this workplan has been received,Cardno ATC will submit a well destruction permit and <br /> accompanied with the associated fees to the EHD. <br /> Once approved,Cardno ATC will confirm the schedule for drilling activities with EHD and will notify the EHD at <br /> least 48 hours prior to the commencement of any field activities.A summary report will be submitted within <br /> approximately 30 days following the completion of field activities. <br /> www.cardnoate.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.