My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
3500 - Local Oversight Program
>
PR0545195
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 11:57:15 AM
Creation date
1/23/2020 11:44:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545195
PE
3528
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
02
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ y <br /> ATC Associates Inc! <br /> Quality Assurance/Quality Control Plan <br /> Revised November 2002 <br /> 9.0 GROUNDWATER MONITORING PROTOCOL <br /> Monitoring of depth to water and free product thickness within wells at the site will be conducted <br /> using an Interface Probe or Conductivity Meter. For consistency, all measurements will be <br /> taken from the;`north side of the wellhead at the survey mark. To assess potential infiltration of <br /> fine-grained sediments, total well depth will also be sounded. <br /> Product thickness is calculated by subtracting'the depth to product from the depth to water. In <br /> addition, water:elevations are adjusted for the presence of fuel with the following calculation: <br /> (Product Thickness) (8) + (Water Elevation) = Corrected Water Elevation <br /> NOTE: The factor of 0.8 accounts for the!density difference between water and petroleum <br /> hydrocarbons. <br /> Newly installed wells will be allowed to stabilize for 24 hours after development prior to free <br /> product inspection. <br /> An acrylic Surface Sampler will be used for visual inspection of the groundwater in order to note <br /> sheens (difficult to detect with the Interface Probe), odors, microbial action and sediments. The <br /> sampler is calibrated in inches and centimeters for visual inspection of product thickness. <br /> To reduce the potential for cross contamination between wells, the monitorings will take place in <br /> order from the least to most contaminated, if known. Wells containing free product will be <br /> monitored last. Between each well monitoringthe equipment will be decontaminated. <br /> w:\admin\shells\qaqc-02.doc <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.