Laserfiche WebLink
GROUNDWATER MONITORING WELL PURGE/SAMPLING WORK SHEET <br /> Project Name CU. J0r.1E(z X3-1 Project Number 54/ 25-9-f-200,37 <br /> • Address IS EA<a- 6a2a ,Y\Ib i e_ Qty Date % i-f Q <br /> T, PA Well Lock Number <br /> Wel bei _ t1W-t _ Well Integrity <br /> Development/Purge/Sampler(s) to Ambient Conditions <br /> Pre-Purge DO (mg/L) <br /> Screened st WELL VOLUME CALCULATION <br /> Well Casing Total Well Depth to Linear Feet Gallons Per <br /> Dia r fin) Depth ft Goundwater G of GW Linear Foot I Well Volume al <br /> 2 2.7 37? - 675 = 20 (02- x 017 <br /> X 038 = <br /> 4 - X 066 = <br /> 45 - = X 083 = <br /> 6 - - x 15 = <br /> GROUNDWATER SURFACE INSPECTION BAILER CHECK) <br /> Floating Product (ft) (in } ot.%E _ SheeMndescence /n�jE Odor --___I( # E <br /> GROUNDWATER PURGING PURGE METHOD <br /> Stainless Steel Bailer, Submersible Pump, Air Diaphragm Pump, Honda Pump, Other <br /> Stagnant Volume <br /> Volumes Purged Conductivity Temp ColorlTurbidity <br /> Purged (gal ) Time pH (}is/umhos) (a C) (other) <br /> 0 0 0931 35 pgr{I .3y _ r?(V& 240 ILEAC WRecovery'26 17N 2q5 <br /> 2 7D D$� 673 1728 2`t q 3 1Q� 019Ltr (o (09 172$ 25$4 <br /> 5 Slow <br /> 6 <br /> 7 <br /> S - <br /> 9 <br /> 10 <br /> GROUNDWATER SAMPLING Sampling Equipment- 05A b s E Q <br /> Water Level Recovery Sample Containers <br /> Depth to GW(ft) No Preservation Method/pH <br /> (1) Initially (v-15 1 liter(L), amber glass <br /> (P) After Purging 170 40 mi VOA }du, <br /> P-0 8 (P-1) = 80% Recovery 500 ml polypropylene <br /> (S) Before Sampling . (675_ Trip Blank <br /> (P-S)/(P-1) X 100 = 100 %Total Recovery <br /> Sample Date/Time 19 Q"( d8$$ Turbidity (NTLI) E" <br /> Calibrate Date/Time $ t`'t C*{ EH (MEV) tJ �l <br /> PURGED WATER CONTAINMENT <br /> Total drums at site Water Soil. Water pump through treatment system r <br /> Remarks <br /> -�..�vK C�A�iI785LTRx.I'CE`c,ROUPtCrR� ��".'. : •—.,..-•--t••�*•----,,,�,s.�- - -----�+�-••�- <br /> - --- <br />