Laserfiche WebLink
TABLE C1, continued <br /> WELL DATE TIME DEPTH GROUNDWATER <br /> • TO ELEVATION <br /> WATER feet, amsl <br /> feet <br /> MW-5 14.90 Et. total depth, diameter 2-in. Rim Elevation: 27.46 <br /> Installed 09/01/95 Mm oring perfornred by Parker ErMraru x5 al Sery m fnxn tw of Gig. <br /> 9/26/95 11.24 6.37 2109 <br /> 2/23/99 10.41 5.16 22.30 <br /> 6/27/99 818 595 21.51 <br /> 8/31/99 923 6.28 21.18 <br /> 2/3/00 9:40 508 22.38 <br /> Monitoring perforrned by H2OGML Casing Elevation: 27 46 <br /> 11/19/00 8:48 658 2088 <br /> 2/23/01 08:51 5.26 22.20 <br /> 5/19/01 10:47 5.74 21.72 <br /> 8/18/01 11:24 634 21.12 <br /> 11/17/01 1054 5.70 21.76 <br /> 2/24/02 1335 5.45 22.01 <br /> Monitoring in abeyance pending receipt of Letter of Cononftwryt. <br /> 2/17/03 920 5.36 22.10 <br /> 5/31/03 9:35 562 21.84 <br /> • <br /> MW-6 14 70 Ft. total depth, diameter 2-in Rim Elevation: 27.25 <br /> inswiled 09/01/95 Monwnn9 Performed by Parker ErrvironmerM Services from top of using <br /> 9/26/95 11:09 6.19 21.06 <br /> 2/23/99 10:50 500 222-5 <br /> 6/27/99 819 579 2146 <br /> 8/31/99 9.16 6.12 2113 <br /> 2/3/00 10.00 5.13 22.12 <br /> Monitoring performed by H2OGEOL Casing Elevation: 27.25 <br /> 11/19/00 853 6.42 2083 <br /> 2/23/01 09:10 5.09 22.16 <br /> 5/19/01 1052 560 2165 <br /> 8/18/01 11:28 6.19 2106 <br /> 11/17/01 10.51 5.56 2169 <br /> 2/24/02 13.32 5.20 22.05 <br /> Monitoring in abeyance pending receipt of Letter of Commitment. <br /> 2/17/03 9.23 5.20 22.05 <br /> 5/31/03 939 547 2178 <br /> H2 OGEOL A GROUNDWATER CONSULTANCY <br /> Table C1, Page 5 of 6 <br />