Laserfiche WebLink
Page 7 <br /> VI. SITE CONTROL/WORK ZONES <br /> A. DESCRIBE LOCATION OF EXCLUSION ZONE, HOT LINE, CONTAMINA'T'ION <br /> REDUCTION ZONE,AND DECONTAMINATION AREA AND SUPPORT ZONE. ZONES <br /> MAY MOVE AS WORK PROCEEDS. DESCRIPTIONS MUST BE RELATIVE TO A MOVING <br /> REFERENCE SHOW LOCATIONS ON SITE PLAN <br /> Exclusion zone: Extends a minimum of 15 feet in all directions from the drill ng when in use <br /> Orient the drill ng and boring so_that_the exclusion zone is upwind. Exclusion zone may be <br /> extended as necessary if warranted by air monitoring- No smolung, eating or dnnlong allowed <br /> in exclusion zone._Contamination reduction Cdecontamination)zone will be located on site. <br /> B DEFINE THE SITE CONTROL/SECURITY MEASURES(I.E., FENCING, LOCKED <br /> GATES, KEYS, SECURITY GUARDS, FLAGGING, ETC) <br /> Barricades, safety cones and caution tape will be used to control exclusion zone <br /> Traffic paddles will be available to control traffic as necessary. <br /> S C. DESCRIBE SAFETY PLAN LOCATIONS <br /> Posted on site in site supervisor's vehicle. <br /> Parker Environmental Services, 190 East 7th Street, Pittsburg, CA 94565-2317 <br /> Phone (510) 439-1024 Fax (510) 439-2566 <br />