My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
FIELD DOCUMENTS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 11:26:48 AM
Creation date
1/24/2020 11:01:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
FileName_PostFix
FILE 2
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Broad <br /> Tosco Reprict Mama Ed Ralston, (916) 774-2910 1. Provide cast-in-place concrete, poured over a prepared subgrotle, where shown on the drawings as <br /> Tosco District Manager. N/A needed for a complete and proper installation. <br /> Target Facility Manager. <br /> Engineer: Ge er-Ryan Inc, Paul LeChemingnt 925 51-7444 t 191 2. Concrete shall be a minimum of 2500 psi and shall have a broom finish to match existing finish. <br /> Contractor. <br /> Environmental Consultant: Gettler- n Inc. David Vossler, `7157 78 -3256 ext 12 <br /> Contractor. To be de Trained <br /> W Genti ficaunnowns, 40 FINDIN ee EnlnwM I eteMDon <br /> 1. Contractor shall mad and abide by the 'Tosco Contractor Safety Handbook' Provitlee by Tosco1. Equipment shol11 be placed in accordance with the New Construction Site Plan (G2) one the Process <br /> Contractor shall provide a Site Specific Health and Safety Plan. . Flow Diagram (G5). <br /> 2. Contractor is to comply with all Federal, State and local environmental laws and ordinances. 2. Tubing from the Ozone Sparge panel to each Sparge Point well head shall be a continuous run, without <br /> splices or connectors. Extreme care shall be taken to ensure that tubing is not cut, crimped, kinked <br /> 3. Contractor is responsible for protecting the environment duringconstruction b or damaged in any way. <br /> y protecting trees and <br /> shrubs, containing any run-on or run-off controlling dust, and containing any contamination caused 3. Contractor shall exercise due care to protect equipment from theft or damage. <br /> apprroved facility r ThTons <br /> cont�rlactor shall disposer of all disposal <br /> struMlon debris, iand ncluding pave at an removed <br /> during construction. <br /> 4. Drawings and notes supercede specifications-any conflict is to be brought to the attention of the Tosco E R <br /> Representative for resolution. 1. The existing chain link fence equiipment enclosure is to remain and be mused. <br /> 5. a consultant is responsible for BVIdin Permit Plan Check fees and for eiacppargqe partnit fees 2. Consultant shall post the following signs: a.) Proposition 65 warning (in California), b.) No Smoking, <br /> AOMNPOES, etc.). All other required <br /> construction permits and inspections (Including all bonds and and c.) Emergency contact telephone number for the consultant. <br /> licenses) for electrical, mechanical, and civil work shall be the responsibility of the contractor. 3. Contractor shall famish and post the following signs: a.) Emergency Shut ON switch sign <br /> 6. It is the gs roject anagerresponaishc be verify all dimensions and conditions before starting work. The <br /> consultants Project Manager shali llll be noti red of any discrepancy. <br /> 7. Construction areas are to be clearly marked with mines, barricades. or other approved safety markers as <br /> required by local codes to restrict access and provide o safe work area for the contractor, facility <br /> workers and customare. <br /> B. The contmetor shall warrantee all materials and workmanship for a period of one year. Defects shall be <br /> corrected at no cost to Tosco. <br /> BA Piano aid Vwlm <br /> 9. Contractor shall pprovide Consultant and Tosco with 0 copy of signetl0 d building permits and o7ASns BUILT' <br /> drawings (accurately marked-up copies of original drawings) within 30 days of completon of construction. 1. Installation details are provided on Drawing G6, Construction Details. <br /> 10. Contractor shall notify the Tosco Representative, the Consultant and the Target Store facility manager 2. Ozone Sparge Tubing shall be installed in Convegnce Conduits sized as noted on plan. Underground <br /> 48 hours prior to the start of work. Conveyance conduit shall be Sheduls 40 PJC. Provide long radius sweeps at all changes in direction <br /> of Conveyance Conduit. <br /> 20 811s,Work 3. Ozone Sparge Tubing shall be installed in continuous runs, without splices, from the Ozone Sparge Panel <br /> 21fartlsork for berltlip to each Ozone Sparge Point <br /> 4. Contractor shall provide permanent identification labels on each sparge line at the spurge panel. <br /> 1. Existing pavement is to be saw cut when removed to provide a square vertical joint for repaving. <br /> 2. Remove and store material encountered to obtain required sub-grade elevations, including pavement, <br /> obstructions visible on the ground surface, underground structures, and utilities Indicated to be removed. <br /> 3 3. Backfill trenches with bedding material after pipes have been tested. Hand tamp around pipes. <br /> Compact adequately to support surface material. (asphalt or concrete). <br /> 5 4. Contractor shall make time and access allowances for Taxes to conduct adequate soil sampling. Tosco <br /> Will provide, pay for, and direct all sampling and disposal of contaminated soil. <br /> s 22 Ww nuweon <br /> 1. Ozone Sorge Point Wells will be constructed by others prior to contractor starting project Well boxes <br /> W - will be furnished and soft set by Sparge Point Installer. Contractor shall reset well boxes In concrete <br /> per details. <br /> 2. Well construction will meet any and all municipal codes affecting well construction. <br /> 0 <br /> 3. Contractor is to peens�ieptly label all wells ton ore both the well-head piping (permanent and on the <br /> Z3 Peering top of the well cover `IeHer punch) with letters and numbers as shown in drawing G2. <br /> F1. Pavement shall be replaced with asphalt or concrete to match the existing pavement. <br /> m' 2. Thickness existing pavement section and to avoid sagging or cracking of pavement <br /> gi <br /> 8 <br /> 8 I REVI90N gy arm <br /> w PRWECm 140124.11 till[: <br /> W ® Gett/er - Ryan Inc. TOSYO FAOI M: FORMA TOSCO (78) STATION #6981 CONSTRUCTION <br /> 6 1464 NOM Me Dowell BoulevaM Suite 82 4707 PACIFIC AVENUE NOTES <br /> s <br /> Petaluma.G 94954 (707)]89-3255 6981 -G 3 STOCKTo, CAt1FORN�A DMWMG No. <br /> 10-11-01 5111 4 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.