Laserfiche WebLink
NOTES: <br /> 1. CONTRACTOR TO FURNISH ALL MATERIALS <br /> AND LABOR NECESSARY FOR COMPLETED <br /> INSTALLATION. <br /> 2. ELECTRICAL WIRING SHALL BE IDENTIFIED <br /> AND PERMANENTLY MARKED. <br /> NEW <br /> Existing Equipment Enclosure 3 SSPBEL GE SYSTEM"UR BREAKER "OZONE <br /> New Ozone Sparge Panel Existing Panel 4. CONNECTION TO NEW OZONE SPARGE <br /> Provide Equipment Install 15 amp circuit breaker PANEL SHALL BE HARD WIRED. <br /> Disconnect/Emergency for new Ozone Sparge Panel <br /> Shut Off outside of <br /> Ozone Sparge Panel <br /> Install new Conduit to <br /> New Junction Box Sparge Panel <br /> °s <br /> W <br /> I <br /> REV/ REYISGN 6Y WTE <br /> PRa,ea:14012411Ryan Inc. ELECTRICAL <br /> Gettler - TOSCO r��' FORMER TOSCO (76) STATION ,$6981 <br /> 4707 PACIFIC AVENUE DIAGRAM <br /> `E 1164 Nodh McDowell BovWaN Suite B2 - STOCKTON CADFORNIA <br /> Petaluma,CA 94954 (707)789-3255 6981 -G 7 MfflNG Na <br /> d a^ 10-11-01 , a of 8 G7 IA <br />