My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 11:28:18 AM
Creation date
1/24/2020 11:08:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4707 Pacific Ave • • <br /> Page 2 <br /> be cut off 6 inches above the bottom of this excavation, and removed. The grout used to <br /> seal the well shall then be topped off and allowed to spill over into the excavation and fill <br /> it for a thickness of one foot to form a 'mushroom cap' over the top of the cut casing. <br /> • If 'nested' wells were installed at the site and need to be destroyed by overdrilling, an <br /> auger larger than the original auger must be used and centered on the deepest casing <br /> (which is off-center in the original borehole). The auger needs to be sized sufficiently to <br /> reach out and remove all well casings, screens, filter packs, and grout sealant installed <br /> during construction. <br /> • All groundwater displaced to the surface during grout installation shall be pumped out of <br /> the excavation and containerized for proper disposal. <br /> • Any wells located offsite require updated access agreements and/or encroachment <br /> permits to be submitted with the EHD Well Destruction Permit Application. <br /> Deadline for submittal of the work plan is June 2, 2013. After the EHD has approved the work <br /> plan you may submit an EHD Well Destruction Permit Application along with the appropriate <br /> fees. Current fees are: $375.00 per permit, (one permit per parcel) plus $125.00 per each well <br /> on the parcel that is to be destroyed. A nested well is considered to be one well. <br /> If you have any questions please contact Lisa Medina at (209) 468-3455 or by email at <br /> Imedina(a)sjcehd.com. <br /> Regards, <br /> Lisa Medina, EH9 <br /> Senior Registered Environmental Health Specialist <br /> c:Jim Barton, CVRWQCB, 11020 Sun Center Drive, Suite 200, Rancho Cordova, CA 95670 <br /> Travis Flora, Stantec Consulting CorR., 15575 Los Gatos Blvd., Bldg C, Los Gatos CA, 95032 <br /> Ryan Zick, Target Corp., 33 South 6 Street, CC-3715, Minneapolis, MN 55440 <br /> II <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.