My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 11:28:18 AM
Creation date
1/24/2020 11:08:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 • <br /> San Joaquin County Department DIRECTOR <br /> oPo�.IN Environmental Health Dep <br /> Donna Heran,RENS <br /> �.' —�f .qG 1868 East Hazelton Avenue PROGRAM COORDINATORS <br /> Z. 'r-�b'--u 2-t <br /> Stockton, California 95205-6232 Robert <br /> eff Carrara slco,REHS,RDI <br /> a: Kasey Foley,REHS <br /> Linda Turkatte,REHS <br /> Website: wwwsjgov.org/ehd Rodney Estrada,REHS <br /> 468-3420 <br /> q��FOR� Phone: (209) Adrienne Ellsaesser,REHS <br /> Fax: (209) 464-0138 <br /> June 17, 2013 <br /> Nicole Arceneaux <br /> Chevron Environmental Management Company <br /> 6101 Bollinger Canyon Road, Room 503 <br /> San Ramon, CA 94583 <br /> RE: Former Unocal#6981 <br /> 4707 Pacific Avenue <br /> Stockton, CA <br /> WORK p�AN.. Well Destruction Work Plan <br /> DATED: June 2, 2013 <br /> PREPAY aYStantec Consulting Services, Inc. <br /> APPROVED: [Xl <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN iH&S 25296.10 (c)(3)1: <br /> 1) To destroy a total of (33) wells: 12 groundwater monitoring wells; 7 extraction wells; 14 <br /> sparge wells. <br /> 2) Wells MW-2, MW-5, MW-15, VW-2, VW-4. VW-5, VW-7, SP-4, SP-7 and SP-13 shall <br /> be over-drilled. MW-1, MW-4, MW-6, MW=7, MW.8, MW-9, MW-11, MW-14, MW-16, <br /> VW-1, VW-3, VW-6, PTW-1, SPA, SP-2, SP-3, SP-5, SP-6, SP-8, SP-9, SP-10, SP-11 <br /> and SP-12 shall be pressure-grouted. <br /> 3) All investigation derived waste, including soil and groundwater from the well destruction <br /> activities shall be stored and disposed of as stated in the Well destruction work-plan. <br /> Manifests are required for removal, transportation and disposal of all wastes associated <br /> with the work. <br /> COMMENTS AND CONDITIONS: <br /> 1) The Environmental Health Department (EHD) requires one well destruction permit <br /> application @ $375.00 to be submitted for each parcel and one for wells located within <br /> the City of Stockton right of way/sidewalks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.