My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 11:25:32 AM
Creation date
1/24/2020 11:10:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(b) The 76 Assets are in compliance with applicable Environmental Laws and <br /> Permits, except where the failure to be in such compliance would not have a sienificant <br /> adverse effect on the operations of the 76 Assets as they have been operated on a <br /> historical basis. <br /> 3. Purchaser's Environmental Representations After Due Diligence. Based on <br /> Purchaser's inquiry and due diligence prior to the Closing, none of the representations <br /> made above by Seller is inaccurate. <br /> 4. Environmental Provisions. <br /> (a) Allocation Of Baseline Corrective Action Costs. Except as otherwise <br /> provided in this Agreement, Seller shall be responsible for Retained Environmental <br /> Liability and the cost of Corrective Action arising out of or related to the Baseline <br /> ("Baseline Corrective Action Costs"), and Purchaser shall be responsible for all other <br /> Corrective Action; provided, however, that Seller's obligation for Baseline Corrective <br /> Action Costs shall expire twenty-five (25) years after the Closing, except as to unpaid <br /> amounts of Baseline Corrective Action Costs invoiced to Seller for work performed prior <br /> to such expiration and except Baseline Corrective Action Costs for a discrete project <br /> begun prior to such expiration and to be completed within a reasonable and definite <br /> time period (but excluding costs associated with monitoring of environmental conditions <br /> and other ongoing non-remediation costs). Baseline Corrective Action Costs shall <br /> include costs incurred to prevent or abate migration of a pre-Closing Release at or from <br /> a 76 Assets to adjoining real property owned, leased or used by a third party. <br /> Notwithstanding the foregoing, Purchaser shall pay, during each calendar year, the first <br /> S7 million of Baseline Corrective Action Costs and forty percent (40%) of the amount of <br /> Baseline Corrective Action Costs (and Seller shall pay the remaining sixty percent <br /> (60%)) in excess of the $7 million, up to a lifetime aggregate of $200 million ("$200 <br /> Million Cap"). Upon and after the occurrence of a Change Event, Seller shall be <br /> charged annually with its allocated share of the Baseline Amortizing Amount in <br /> accordance with the allocation of responsibility for Baseline Corrective Action Costs <br /> provided in this Section 4(a). Purchaser shall be responsible for all Corrective Action <br /> costs in excess of the Baseline Amortizing Amount, and such costs shall not be included <br /> in the calculation of the $200 Million Cap. Only Purchaser's allocated share of the <br /> Baseline Amortizing Amount shall be included in the calculation of the $200 Million <br /> Cap. "Baseline Amortizing Amount" means the annual Baseline Corrective Action Costs <br /> with respect to a facility at which a Change Event has occurred, estimated in good faith <br /> using the Corrective Action Plan as a guideline and assuming that such Change Event <br /> had not occurred. "Change Event" means: (i) the closure of a 76 Asset site (other than <br /> a Retail Site); and/or (ii) the change in use of a 76 Asset (other than a Retail Site) to a <br /> use outside the petroleum/chemical industry. For purposes of this Section, closure <br /> means the termination of substantially all operations at a site which results in an <br /> acceleration of or additional Baseline Corrective Action from what is otherwise set forth <br /> in the Corrective Action Plan prior to the contemplation of closure of such site, or if no <br /> such Corrective Action Plan exists prior to such contemplation, Seller's existing plans for <br /> such site. <br /> 5, <br />
The URL can be used to link to this page
Your browser does not support the video tag.