My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012608
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
ARCHIVED REPORTS_XR0012608
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 11:51:05 AM
Creation date
1/24/2020 11:21:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012608
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fi <br /> i^ <br /> September 13. 1991 <br /> Unocal Station No. 6981, Stockton. Caliā¬oral, <br /> re, <br /> If no floating product is detected, the well will be developed with a surge block and pump. <br /> Well development will continue until the discharge water is clear c f silt and sand. Clay-size <br /> sediments derived from the screened portion of the formation cannot be entirely eliminated <br /> by well development. <br /> After the well has been allowed to stabilize, the well will be purged and a groundwater <br /> sample will be -.ollected for laboratory analysis. The well will be purged of approximately <br /> 3 to 5 well volumes of water with a submersible pu:ap. or until pl-1, conductivity, and <br /> temperature of the purged water have stabilized. <br /> The wells will be allowed to recover to at least 80 percent of static conditions,and a samp e <br /> of the formation water will be collected with a Teflon bailer cleaned with a laboratm-grade <br /> detergent and deionized water. The water will be transferred slowly from the bailer to <br /> Iaboratory-cleaned, 1-liter amber bottles and 40-milliliter glass vials for analyses by the <br /> laboratory. The glass vials will contain hydrochloric acid as a preservative. Our geologist <br /> will check to see if headspace is present. If headspace is present, we will collect more <br /> samples until a headspace is absent. Chain of Custody Records will be initiated in the field <br /> by the geologist, updated throughout handling of the samples. and sent along with the <br /> samples to the laboratory. Copies of Chain of Custody Records will be included in our final <br /> report. <br /> Va or-Extraction Well Construction <br /> The vapor-extraction well will be terminated at approximately 45 feet below grade and will <br /> be Constructed in the boring with thread-jointed,3-inch-or 4-inch-inner-diameter,Schedule <br /> 40 PVC casing. No chemical cements, glues, or solvents will be used in well construction. <br /> The screened portion of each well will consist of factory-perforated casing with 0.1-inch-wide <br /> w <br /> 38032-4W 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.