Laserfiche WebLink
LvivU11 WNS FOR N-3:335-1-0 <br /> Page- 2 <br /> 8. Provlslons jhall �e made for laboratory samples to be taken under the supervision of the APCD ins <br /> during the Mltial inspection. Initial inspections shall be performed priopectar <br /> the thermal oxidizer and the carbon system r to the start-up of both <br /> 9. The sam W ,shall be analyzed for TPH and BTEX• Readings shall be taken with an FID, PID, or other <br /> ')'Strict �PProved VOC detection device, from the same sampling its i <br /> laboratory samples P $ Po mmad�ately fo]Iowing the <br /> 10. At the tfmq of the initial inspections, measurements shall be taken to determine the influent and <br /> effluent flaw rates, <br /> 11• VOC control eMetency aomplIance shall be demonstrated by results of laboratory samples prior to <br /> commencing system operations <br /> 12• The thermal nxi41zer shall be equipped with an operational temperature gauge to indicate the <br /> tomperaturo of the combustion chamber. A continuous recording device shall be utilized to record the <br /> combustion chamber temperature during operation, <br /> 13, The thermal oxidizer combustion dhamber ternperatuf& sho11 be kept at or above 1400 degrees fahrenheit <br /> at all times. An automatics stem shall be used to shut the system down if the combustion chamber <br /> temperature drops below IN degrees fahrenheit. <br /> 14. The thermal oxidizer and the carbon system shall not be operated simultanoously. <br /> 15, The VOC emissions from the thermal oxidizer shall not exceed 46,9 pounds per day. <br /> 16. The VOC emissions from the carbon system shall not exceed 2.0 pounds per day, <br /> 17, Operation of the soil remediation system shall not exceed throe years without prior District approval, <br />