My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012194
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
ARCHIVED REPORTS_XR0012194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 12:57:34 PM
Creation date
1/24/2020 11:57:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012194
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GR Field Methods and Procedures <br /> Field Screeninia of Soil Sam les <br /> A PID is used to perform head-space analysts in the field for the presence of organic vapors <br /> from the soil sample This test procedure involves removing some soil from one of the sample <br /> tubes not retained for chemical analysis and immediately covering the end of the tube with a <br /> plastic cap The PID probe is inserted into the headspace inside the tube through a hole in the <br /> plastic cap Head-space screening results are recorded on the boring log Head-space screening <br /> procedures are performed and results recorded as reconnaissance data GR does not consider <br /> field screening techniques to be verification of the presence or absence of hydrocarbons <br /> Construction of Monitoring Wells <br /> Monitoring wells are constructed in the exploratory soil borings with Schedule 40 polyvinyl <br /> chloride(PVC)casing All joints are thread joined, no glues,cements,or solvents are used in <br /> well construction The screened interval is constructed of machine-slotted PVC well screen <br /> which generally extends from the total well depth to a point above the groundwater An <br /> appropriately-sized sorted sand is placed in the annular space adjacent to the entire screened <br /> . interval A bentonite transition seal is placed in the annular space above the sand, and the <br /> remaining annular space is sealed with neat cement or cement grout <br /> Wellheads are protected with water-resistant traffic-rated vault boxes placed flush with the <br /> ground surface The top of the well casing is sealed with a locking waterproof cap A lock is <br /> placed on the well cap to prevent vandalism and unintentional introduction of materials into <br /> the well <br /> Measurement of Water Levels <br /> The top of the newly-installed well casing is surveyed by a California-licensed Land Surveyor <br /> to mean sea level (MSL) Depth-to-groundwater in the well is measured from the top of the <br /> well casing with an electronic water-level indicator Depth-to-groundwater is measured to the <br /> nearest 0 01-foot, and referenced to MSL <br /> Well Development and Sam lin <br /> The purpose of well development is to improve hydraulic communication between the well and <br /> the surrounding aquifer Prior to development, each well is monitored for the presence of <br /> floating product and the depth-to-water is recorded Wells are then developed by alternately <br /> surging the well with a vented surge block, then purging the well with a pump or bailer to <br /> A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.