Laserfiche WebLink
Map ID MAP FINDINGS <br /> Direction <br /> Distance <br /> Distance(ft.) EDR ID Number <br /> Elevation Site Database(s) EPA ID Number <br /> PG&E MANUFACTURED GAS PLANT SQ-SK-TRA (Continued) S101482139 <br /> Confirmed: NONE SPECIFIED <br /> Confirmed Description: Not reported <br /> Future Area Name: Not reported <br /> Future Sub Area Name: Not reported <br /> Future Document Type: Not reported <br /> Future Due Date: Not reported <br /> Media Affected: 30013 <br /> Media Affected Desc: Not reported <br /> Management Required: NONE SPECIFIED <br /> Management Required Desc: Not reported <br /> Potential: NONE SPECIFIED <br /> Potenital Description: Not reported <br /> Schedule Area Name: Not reported <br /> Schedule Sub Area Name: Not reported <br /> Schedule Document Type: Not reported <br /> Schedule Due Date: Not reported <br /> Schedule Revised Date: Not reported <br /> PastUse: MANUFACTURED GAS PLANT <br /> ENVIROSTOR: <br /> Site Type: State Response <br /> Site Type Detailed: State Response or NPL <br /> Acres: Not reported <br /> NPL: NO <br /> Regulatory Agencies: SMBRP <br /> Lead Agency: NONE SPECIFIED <br /> Program Manager: Not reported <br /> Supervisor: Randy Adams <br /> Division Branch: Central California <br /> Facility ID: 39490010 <br /> Site Code: Not reported <br /> Assembly: 17 <br /> Senate: 05 <br /> Special Program: Not reported <br /> Status: Backlog <br /> Status Date: 1995-06-08 00:00:00 <br /> Restricted Use: NO <br /> Funding: Responsible Party <br /> Latitude: 37.7466666666667 <br /> Longitude: -121.417222222222 <br /> Alias Name: CAD981415920 <br /> PG&E MANUFACTURED GAS PLANT TRA <br /> 39490010 <br /> Alias Type: Calsites ID Number <br /> EPA Identification Number <br /> Alternate Name <br /> APN: NONE SPECIFIED <br /> APN Description: Not reported <br /> Comments: PG&E completed a Site Investigation in April, 1989.Soil samples <br /> collected from 33 borings indicated PAH contamination of soil ranging <br /> from 0.08 to 1,062 ppm. TPH and BTEX contamination in soils also <br /> identified. Low level BTEX contamination of groRECOMMENDED <br /> PRELIMINARY ENDANGERMENT ASSESSMENT(MEDIUM PRIORITY).NO CLEANUP <br /> DOCUMENTEDFACILITY IDENTIFIED BY PG&E INSPECTION. RP-PA CONDUCTED, <br /> REPORT TO DHS SAMPLE RESULTS. RP SAMPLED: LEAD 150 PPMund water in <br /> area of former underground storage tank. Hazard ranking recommended. <br /> Completed Area Name: PROJECT WIDE <br /> TC1913090.8s Page 10 <br />