Laserfiche WebLink
submitted to DTSC for review and approval. Additionally, work notices were prepared for the <br /> community and PG&E employees working at the Tracy Service Center (formerly the Tracy <br /> MGP Site) outlining the proposed activities to be conducted as part of the RI/SSI. <br /> 1.4 REPORT ORGANIZATION <br /> This Report is organized as follows: <br /> • Section 1.0—Introduction presents general information applicable to the RI and SSI, the <br /> overall purpose and objectives of this Report and its organization. <br /> • Section 2.0 — Setting and Background Information presents the location, setting, <br /> historical land use at the Site and a discussion of previous investigations conducted at the <br /> Site. <br /> • Section 3.0 — Site Investigation Activities presents an overview of the activities <br /> conducted at the Site; the procedures and methodology by which the RI and SSI were <br /> conducted; deviations from the April 2008 Workplan and/or Final Technical <br /> Memorandum; health and safety/air monitoring results; and the disposition of <br /> investigation derived waste generated during the implementation of the RI/SSI. <br /> • Section 4.0 — Analytical Results presents the laboratory results for soil, soil gas and <br /> groundwater samples collected during the RI/SSI; a delineation of MGP related impacts; <br /> and an assessment of the data quality. <br /> • Section 5.0 — Human Health Risk Assessment briefly describes the process for the <br /> development of the HRA including an HRA scoping meeting to be conducted with <br /> DTSC. <br /> • Section 6.0—Summary, Conclusions and Recommendations present a summary of the <br /> RI/SSI, conclusions based on the analytical results from the RI/SSI and recommends that <br /> the Site advance to the remediation phase. <br /> • Section 7.0 — References presents a listing of the documents and information used in <br /> preparation of this report. <br /> In addition to sections described above, tables and figures have been provided to assist the reader <br /> with visualizing the RI/SSI. Finally, the appendices for this report include the following: <br /> • Appendix A — VCA Docket No. HSA-VCA 07/08-072 provides a copy of the VCA <br /> under which this work is being completed; <br /> • Appendix B—Environmental Data Resources, Inc. (EDR) Database Report provides <br /> the environmental database records report for the Site, dated April 27, 2007; <br /> • Appendix C — Site Photos provides photos of the Site from the remedial investigation <br /> conducted at the Site; <br /> • Appendix D — Site Specific Health and Safety Plan provides the documentation on <br /> how the work at the Site was conducted in a safe manner; <br /> • Appendix E — Remedial Investigation Boring Logs and Well Completion Diagram <br /> provide documentation for the drilling of the soil borings and wells at the Site; <br /> PARSONS 8 FINAL RI REPORT-FORMER TRACY MGP <br /> APRIL 2010 <br />