My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0013116
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
502
>
2900 - Site Mitigation Program
>
PR0528085
>
ARCHIVED REPORTS_XR0013116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 1:25:18 PM
Creation date
1/24/2020 12:05:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013116
RECORD_ID
PR0528085
PE
2959
FACILITY_ID
FA0019016
FACILITY_NAME
PG&E TRACY SERVICE CENTER
STREET_NUMBER
502
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
502 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1441
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHARP Management Manual <br /> 'F <br /> Former Tracy MGP Project Safety Plan(PSP) <br /> TABLEOF CONTENTS............................................................................................... 1 <br /> SECTION 1 — INTRODUCTION................................................................................... 1 <br /> 1.1 PARSONS WORKPLACE HEALTH &SAFETY POLICY ............................................... 1 <br /> 1.2 THE PROJECT SAFETY PLAN/PROGRAM (PSP) ..................................................... 1 <br /> 1.3 SUBCONTRACTOR SAFETY PLANS........................................................................ 1 <br /> SECTION 2— SCOPE OF WORK................................................................................ 1 <br /> 2.1 SCOPE OF WORK................................................................................................ 1 <br /> 2.2 PROJECT SAFETY PLAN APPLICATION .................................................................. 1 <br /> SECTION 3— PROJECT SAFETY MANAGEMENT RESPONSIBILITIES AND <br /> AUTHORITY............................................................................................................. 1 <br /> 3.1 SAFETY RESPONSIBILITY MATRIX......................................................................... 1 <br /> SECTION 4—ADMINISTRATIVE PHASE..................................................................... 1 <br /> 4.1 PROJECT SAFETY COMMITTEE ............................................................................. 1 <br /> 4.2 PROJECT ORIENTATION....................................................................................... 1 <br /> 4.3 AWARENESS CAMPAIGN ...................................................................................... 1 <br /> 4.4 STAKEHOLDER PSP ALIGNMENT MEETING............................................................ 1 <br /> 4.5 TRAINING ........................................................................................................... 1 <br /> 4.6 AUDITS AND INSPECTIONS.................................................................................... 1 <br /> 4.7 MEETINGS.......................................................................................................... 1 <br /> 4.8 REPORTING AND MEASUREMENT.......................................................................... 1 <br /> 4.8.1 Reporting................................................................................................................1 <br /> 4.8.2 Measurement .........................................................................................................1 <br /> 4.8.3 Incident Notification................................................................................................1 <br /> 4.9 INCIDENT INVESTIGATIONS ................................................................................... 1 <br /> 4.10 RESPONSIBILITY/IDENTIFICATION OF KEY LINE PERSONNEL.................................... 1 <br /> 4.11 MEDICAL REQUIREMENTS AND WORKERS COMPENSATION ..................................... 1 <br /> 4.11.1 Functional Capacity Exams (FCEs)........................................................................1 <br /> 4.11.2 Substance Abuse and Alcohol Testing...................................................................1 <br /> 4.11.3 Medical Services and Panel of Physicians.............................................................1 <br /> 4.11.4 Emergency Medical Response...............................................................................1 <br /> 4.11.5 Workers Compensation Program ...........................................................................1 <br /> 4.11.6 Medical Surveillance Programs and/or Monitoring .................................................1 <br /> SECTION 5— PRE-FIELD WORK PHASE................................................................... 1 <br /> 5.1 RISK ANALYSIS AND SAFETY SPECIFICATION DEVELOPMENT.................................. 1 <br /> 5.2 DESIGN AND REMEDIAL INVESTIGATION REVIEW .................................................... 1 <br /> 5.3 PRE-BID MEETING............................................................................................... 1 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.