Laserfiche WebLink
SHARP Management Manual <br /> F <br /> �s Former Tracy MGP Project Safety Plan(PSP) <br /> Activity Hazards Analysis <br /> Page of <br /> Project Name&Number:PG&E Former AHA No. Date: 10/6/2006 New: <br /> Tracy MGP Site <br /> Location:Tracy,CA Contractor:xxx Revised: <br /> Required Personal Protective Equipment Analysis by:Thomas Blaney Date:7/30/2007 <br /> Level D Modified/Respiratory protection <br /> if required based on monitoring results <br /> Su per!ntendent/Competent Person: Reviewed by: Date: <br /> Thomas Blaney <br /> Work Task/Activity:Backfill of excavations Approved by: Date: <br /> Hazards Preventive or Corrective Measures <br /> oo Only qualified operators will be allowed to operate heavy equipment,per safe work guidelines included in the OSHA General <br /> Industry(29 CFR 1910)and Construction Industry(29 CFR 1926)standards. <br /> Equipment oo Personnel will never walk directly behind or to the side of operating equipment without the operator's knowledge. <br /> Operation oo Do not wear loose-fitting clothing or other items such as rings or watches that could get caught in moving parts. Long hair will <br /> be restrained. <br /> oo Store excavated spoils>3 feet from excavation edge <br /> Open oo Inspect daily for slope stability—Excavation Competent person <br /> excavations oo Remove any ponding water/maintain dust control measures as necessary <br /> 00 Store excavated spoils>3 feet from excavation edge <br /> oo Use proper traffic control(cones,advance warning signs)when blocking traffic lanes or shoulders. <br /> Vehicle Traffic oo All vehicles used at the site,including personal and rental vehicles,must be inspected and decontaminated prior to leaving site. <br /> oo Wear an orange traffic safety vest when working around heavy equipment or near vehicular traffic. <br /> A-6 <br />