Laserfiche WebLink
PARSONS Field Boring Log <br /> Job No. 444534.02000 Client/Site:PG&E Former Tracy MGP Site <br /> Drilling Co./Method BoringNVell No. <br /> Woodward/Hand Auger A3-SG1 <br /> Sampling Method <br /> Hand Auger/8 ounce Glass Jars Sheet <br /> Background Conditions 1 of 1 <br /> Sunny,dry Drill ing <br /> Surface Conditions Start Finish <br /> Asphalt Date Date <br /> 07/10/2008 07/10/2008 <br /> 3 Instrument:PID m 6 Notes:Vapor probe set at 6 ft bgs.Groundwater not <br /> o z <br /> z o m > LL Time Time <br /> o o encountered. <br /> N N Q L C L 0 <br /> E I— m 6 N J 09:00 10:00 <br /> W — G on <br /> U m <br /> 0 Asphalt:0 to 0.5 ft bgs. <br /> Roadbase:0.5 to 1.0 ft bgs. <br /> A3-SG1-1 1.0-1.5 09:30 1 <br /> Silty CLAY(CL):black(10YR2/1);moist;little silt;hydrocarbon-like odor. <br /> 2 <br /> m <br /> a <br /> 3 <br /> = Silty CLAY(CL):same as above,some silt. <br /> 4 <br /> 0.0 0.0 Silty CLAY(CL):dark gray(10YR4/1);moist;some silt(more than above);less odor. <br /> A3-SG1-5 5.0-5.5 09:50 5 Clayey SILT(ML): verydark grayish brown(10YR3/2;moist;little clay;faint <br /> odor. <br /> 6 Boring Terminated @ 6 ft bgs. <br /> 7 <br /> 8- <br /> 9- <br /> 10— <br /> Logged <br /> 910Logged By: M.Rose <br /> Reviewed By: Fred Kintzer,P.G. Signature: <br />