Laserfiche WebLink
Page of <br /> PARSONS <br /> Soil Vapor Pur in /Sam piing Lo <br /> Project Name: vat /%,,-Ge Soil Vapor Probe ID: <br /> Project Number: tk14%%f.1q. Summa Canister#: I �® <br /> Date: 1014, t Flow Controller#: <br /> Personnel: Initial Vacuum: L ( <br /> Sample ID and Time: ,l Final Vacuum: — tr . <br /> LB <br /> Tubing Length: 182.88 cm Total Purqe Times(minutes}: <br /> Tubing ID: 0.43 cm 1 Purge Volume: 9.46 <br /> Probe Tip Length: 22.86 cm 2 Purge Volume: 18.91 <br /> Probe ID: 2.66 cm 3 Purge Volume: 28.37 <br /> Hand Auger Diameter: 7.62 cm 4 Purge Volume: 37.83 <br /> Filter Pads Height: 38.10 cm 5 Purge Volume: 47.28 <br /> Purge Flow Rate: 200 mUmin 6 Purge Volume: 56.74 <br /> Summa Reg.Flow: 200 mumin 7 Purge Volume: 66.20 <br /> Total 1 Purge Volume: 1891.32 cm3(or mL) <br /> Eq.for Total 1 Purge Volume(cm'); <br /> ((Tubing/D12)2*pi*Tubing Length)+((Probe ID12)2*pi Probe Tip Length)+((Hand Auger Diameter12)2*pi*Filter Pack Height) <br /> Note:Units must be as outlined in the input boxes above to be correct. <br /> OReading COReading Purge Total V OC (e In Shroud He In Tedlaro Magneh l c <br /> Z Z <br /> Time He Flow Rate Reading relative /o or Bag(relative /o ReadingComments <br /> (relative%) (relative%) Volume (P bv) ppm) or ppm) ('of water) <br /> Ind5 <br /> L, A:[—,60—7 e Fa �q <br /> { [[m <br /> $6 67 <br /> •F s <br /> ' I <br />