Laserfiche WebLink
Page ! of <br /> PARSONS <br /> Soil Vapor Purging/Sampling Logr� <br /> Project Name: It-41c,4 G3 Soil Vapor Probe ID: 1 _ <br /> Project Number:_14 1 SIM 1,1 Summa Canister#: p <br /> Date: (Y tai` Flow Controller#: p ,7 <br /> Personnel: rt Initial Vacuum: ' <br /> Sample ID and Time: "E" Final Vacuum: <br /> Tubing Length: 182.88 cm Total Purge Times(minutes): <br /> Tubing ID: 0.43 cm 1 Purge Volume: 9.46 <br /> Probe Tip Length: 22.86 cm 2 Purge Volume: 18.91 <br /> Probe ID: 2.66 cm 3 Purge Volume: 28.37 <br /> Hand Auger Diameter. 7.62 cm 4 Purge Volume: 37.83 <br /> Filter Pack Height: 38.10 cm 5 Purge Volume: 47.28 <br /> Purge Flow Rate: 200 mUmin 6 Purge Volume: 56.74 <br /> Summa Reg.Flow: 200 mUmin 7 Purge Volume: 66.20 <br /> Total 1 Purge Volume: 1891.32 cm3(or mL) <br /> Eq.for Total 1 Purge Volume(cm3): <br /> ((Tubing/D)2)2*pi*Tubing Length]+((Probe/D)2)2*pi"Probe Tip Length]+((Hand Auger Diameter2)2*pi*Filter Pack Height] <br /> Note:Units must be as outlined in the input boxes above to be correct. <br /> Total VOC He In Shroud He In Tedlar Magnehelic <br /> ov a <br /> Time He Ff (r Reading COelative%) (relative <br /> Reading Purgeative%) Volume Reading (relative%or Bag(relative% Reading Comments <br /> (r (ppbv) Iwo or ppm) "of water) <br /> a <br /> Je `e <br /> a : <br /> '0 <br /> 4-7 <br /> (• -- <br /> 6. <br /> f1 <br /> b� i <br />