My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
4 (STATE ROUTE 4)
>
17750
>
2900 - Site Mitigation Program
>
PR0501477
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:09:22 AM
Creation date
1/24/2020 2:15:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0501477
PE
2965
FACILITY_ID
FA0005116
FACILITY_NAME
SMS BRINERS INC
STREET_NUMBER
17750
Direction
E
STREET_NAME
STATE ROUTE 4
City
STOCKTON
Zip
95206
APN
18314010
CURRENT_STATUS
01
SITE_LOCATION
17750 E HWY 4
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> Mike Infurna [EH] <br /> To: Till@lsce.com <br /> Subject: RE: SMS Briners Soil <br /> -----Original Message----- <br /> From: Till@lsce.com [mailto:teangermann@lsce.com] <br /> Sent: Tuesday, September 02, 2003 3:52 PM <br /> To: Mike Infurna [EH] <br /> Subject: SMS Briners Soil Borings <br /> Dear Mr. Infuma: <br /> subsequent to the driller's inspection of the drilling site located in the south <br /> pond of the SMS Briners, Inc. facility, I would like to confirm Wednesday <br /> 9/10/2003 (previously communicated to you as the tentative drilling date) as <br /> the drilling date. Depending on progress made during drilling, it is possible <br /> that the abandonment of the first soil boring may not occur on 9/10 but in the <br /> morning of 9/11. I will keep you informed such as to provide you with as much <br /> prior notice as possible. <br /> The site inspection revealed increasingly moist and soft soil conditions towards <br /> the center of the pond, which make the center presently inaccessible for <br /> drilling equipment. Thus, the soil borings will be drilled towards the outer <br /> perimeter of the pond, where the pond floor is firm enough to support drilling <br /> equipment. This has been communicated to, and approved by Howard Hold of <br /> the Regional Board. <br /> The Annual Monitoring Report for 2002, the January-June 2003 Semi-Annual <br /> Report, and an addendum to the Annual Monitoring Report for 2002 will be <br /> mailed to you today. <br /> Sincerely, <br /> Till E. Angermann <br /> (Hydrogeologist) <br /> Luhdorff and Scalmanini, Consulting Engineers <br /> 500 First Street <br /> Woodland, CA 95695 <br /> phone: 530-661-0109 <br /> fax: 53o-661-6806 <br /> 9/3/2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.