My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
4 (STATE ROUTE 4)
>
17750
>
2900 - Site Mitigation Program
>
PR0501477
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:09:22 AM
Creation date
1/24/2020 2:15:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0501477
PE
2965
FACILITY_ID
FA0005116
FACILITY_NAME
SMS BRINERS INC
STREET_NUMBER
17750
Direction
E
STREET_NAME
STATE ROUTE 4
City
STOCKTON
Zip
95206
APN
18314010
CURRENT_STATUS
01
SITE_LOCATION
17750 E HWY 4
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Mike Infurna <br /> August 13, 2003 <br /> Page 2 <br /> whether the south pond is now dry and accessible. On August 11, 2003,we advised the Regional <br /> Board(Howard Hold) of LSCE's plan to submit this permit application to the Environmental <br /> Health Department (EHD) and for tentatively, pending pond access and EHD permit approval, <br /> proceeding with the soil boring construction in early September. It is our understanding from <br /> discussions with Mr. Hold that the Board verbally approves of the planned soil boring <br /> construction program as described in the Annual Monitoring Report for 2002. <br /> In addition to the Well Permit Application, also enclosed are the signed Licensed Contractors <br /> Declaration, the signed Master File Record Information, and two maps showing the location of <br /> the premises and the approximate locations of the planned soil borings. Also enclosed, as <br /> instructed in your e-mail of August 12, are two checks. One check in the amount of$149 is for <br /> the construction($89) and destruction($60) permit fees;the second check in the amount of <br /> $279 is for the three-hour staff time pre-payment. Although LSCE is providing the enclosed <br /> checks for application purposes, future EHD billing should be directed to the attention of SMS <br /> Briners. <br /> Although a letter of approval from the Regional Board was indicated in your e-mail of August <br /> 12,the Regional Board has not provided written confirmation of its acceptance of the planned <br /> work. Please advise if written approval of the Board's concurrence is needed, or if a phone call <br /> directly between yourself and Mr. Hold will suffice. <br /> We appreciate your assistance with this permit application. Please call if you have any questions. <br /> Sincerely, <br /> LUHDORFF AND SCALMANINI <br /> CONSULTING ENGINEERS <br /> Vicki Kretsinger <br /> Principal Hydrologist <br /> VK/kk <br /> Enclosures <br /> cc: Robert Chelli, SMS Briners <br /> 10 <br /> LUHOORFF NE SCALMANINI <br />
The URL can be used to link to this page
Your browser does not support the video tag.