My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
4 (STATE ROUTE 4)
>
17750
>
2900 - Site Mitigation Program
>
PR0501477
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:09:40 AM
Creation date
1/24/2020 2:21:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0501477
PE
2965
FACILITY_ID
FA0005116
FACILITY_NAME
SMS BRINERS INC
STREET_NUMBER
17750
Direction
E
STREET_NAME
STATE ROUTE 4
City
STOCKTON
Zip
95206
APN
18314010
CURRENT_STATUS
01
SITE_LOCATION
17750 E HWY 4
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Golder Associates Inc. <br /> lose Enterprise Way,State 350 elder <br /> Roseville,CA USA 95678 <br /> Telephone: 1?16)786-2424 ASSOCW(aS <br /> Fax:(916)786-2434 <br /> October 18,2004 PO4-7204 <br /> Central Valley Regional Water Quality Control Board <br /> 11020 Sun Center Drive, #200 <br /> Rancho Cordova, CA 95670-6114 <br /> Attention: Mr.Howard Hold,R.G. <br /> Re.: WORK PLAN FOR GEOTECFINICAL AND ENVIRONMENTAL FIELD <br /> EXPLORATION <br /> SMS BRINERS FACILITY EVAPORATION PONDS <br /> STOCKTON,CALIFORNIA <br /> Dear Mr.Hold: <br /> Golder Associates, Inc. (Golder)has been retained by SMS Briners to assist in evaluating the vadose <br /> zone underlying the facility's evaporation ponds. The evaluation will assist in weighing alternatives <br /> for closing the impoundments as required by the Waste Discharge Requirements for Closure, Post <br /> Closure and Corrective Action of Surface Impoundments at Kruger Foods, Inc. — SMS Briners <br /> Vegetable Brining Facility, San Joaquin County (tentative order) dated July 15, 2004, Golder's <br /> evaluation will supplement current work being conducted by Luhdorff and Scalmanini, Consulting <br /> Engineers (LSCE) for characterizing the extent of chloride-impacted groundwater related to site <br /> closure,as described in their Revised Work Plan dated September 20,2004. <br /> LSCE's Revised Work Plan includes a characterization of the lateral and vertical extent of chloride- <br /> impacted groundwater using cone penetration testing(CPT). Golder is proposing to advance three(3) <br /> additional CPT soundings, along with five (5) hollow-stem-auger (HSA) borings, to characterize <br /> chloride concentrations and geotechnical properties in the vadose zone underlying and surrounding <br /> the ponds. <br /> Golder's proposed scope of work and schedule are provided herein. <br /> PROPOSED SCOPE OF WORK <br /> General <br /> The proposed scope of work for the field exploration and laboratory testing program was developed <br /> to accomplish the two following goals: <br /> • Assess salt concentrations in existing soils at the base of the stabilization ponds to identify <br /> impacted soils and to aid in final closure design;and, <br /> • Estimate relevant geotechnical properties of soils within the existing berms and below the <br /> ponds to assist in final design. <br /> This work will include pre-field activities, drilling, sample collection, chemical and geotechnical <br /> laboratory analysis, and reporting. This scope of work consists of sample collection for <br /> OFFICES ACROSS ASIA, AUSTRALASIA, EUROPE,NORTH AMERICA,SOUTH AMERICA <br />
The URL can be used to link to this page
Your browser does not support the video tag.