My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
13170
>
2900 - Site Mitigation Program
>
PR0505432
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 2:57:55 PM
Creation date
1/24/2020 2:40:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505432
PE
2960
FACILITY_ID
FA0006779
FACILITY_NAME
DIVIDEND PROPERTY
STREET_NUMBER
13170
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
13170 W GRANT LINE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> GEQMATRIX <br /> PROTOCOL <br /> INSTALLATION AND DESTRUCTION OF WELLS <br /> 1.0 INTRODUCTION <br /> This protocol describes procedures to be followed during the installation or destruction of <br /> monitoring, groundwater extraction, and vapor extraction wells. The procedures presented <br /> :herein are.intended to be of general use. As the work progresses, and if warranted <br /> g P g , <br /> appropriate revisions will be made and approved by the project manager. Detailed <br /> procedures in this protocol may be superceded by applicable regulatory requirements. <br /> 2.0 WELL INSTALLATION <br /> . If required, permits for the installation of wells will be acquired from the appropriate <br /> regulatory agency before drilling is initiated. After well installation, well completion <br /> report(s) will be completed and filed with the California State Department of Water <br /> Resources or the appropriate agency. <br /> Each groundwater monitoring well will be designed to enable measurement of the potentio- <br /> ,,,� .metric surface and to permit water sampling of a specific water-bearing zone. Each vapor <br /> monitoring well will be designed to enable measurement of pressure conditions and permit <br /> sampling of a specific zone. The field geologist/engineer, in consultation with the project <br /> Geologist or Engineer who will be registered with the State of California if required, will <br /> specify the screened interval using the lithologic log and geophysical log (if performed) and <br /> will select the well materials and techniques for well completion to be compatible with the <br /> formations and the intended use of the well. Drilling and logging of the borings for the <br /> wells will be in conformance with the protocol DRILLING OF SOIL BORINGS. <br /> I' INSTALLATION AND DESTRUCTION OF WELLS <br /> MSC�GEOMATRX.PRO REVISION DATE:NOVEMBER 1992 p <br /> Page 1 of Q <br /> I �` <br />
The URL can be used to link to this page
Your browser does not support the video tag.