My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
13170
>
2900 - Site Mitigation Program
>
PR0505432
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 2:57:55 PM
Creation date
1/24/2020 2:40:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505432
PE
2960
FACILITY_ID
FA0006779
FACILITY_NAME
DIVIDEND PROPERTY
STREET_NUMBER
13170
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
13170 W GRANT LINE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOMATRIX <br /> surface. All wells will be locked for security, and will be designed to limit surface water <br /> infiltration. <br /> 2.6 DOCLJII NTATION <br /> A well construction diagram for each well will be completed in the field on the <br /> MONITORING WELL LOG by the field geologist/engineer and submitted to the project <br /> geologist or engineer upon completion of each well. Well installation and construction data <br /> will be summarized on the FIELD WELL CONSTRUCTION SUMMARY. Well develop- <br /> ment notes and field measurements of water quality parameters will be summarized on a <br /> MONITORING WELL SAMPLING RECORD. A DAILY FIELD RECORD and the well <br /> development record will also be submitted to the project geologist or engineer upon <br /> completion of each monitoring well. <br /> 3.0 CLEANING OF DRILLING EQUIPMENT <br /> Cleaning of the drill rig and associated drilling equipment will follow the procedures <br /> discussed in Section 2 of the protocol DRILLING AND DESTRUCTION OF SOEL <br /> BORINGS. <br /> ` All well casing materials will be cleaned thoroughly before they are installed. Well <br /> " development equipment will be cleaned thoroughly before use. The following cleaning <br /> procedure has been found to be effective and will be used or adapted as appropriate for <br /> - general conditions of materials or equipment to be cleaned. <br /> 1. Swab surfaces inside and out with a laboratory g g Po rade deter ent- table water <br /> solution or steam clean with a detergent-potable water solution. <br /> 2. Steam rinse with potable water or rinse in deionized or organic-free water. <br /> 3. Cover with clean plastic to protect materials and equipment from contact with <br /> chemical products, dust, or other contaminants. <br /> INSTALLATION AND DESTRUCTION OF WELLS <br /> MSC\GEOMATRX.PRO REVISION DATE:NOVEMBER 1992 Page 6 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.