My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
13170
>
2900 - Site Mitigation Program
>
PR0505432
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 2:57:55 PM
Creation date
1/24/2020 2:40:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505432
PE
2960
FACILITY_ID
FA0006779
FACILITY_NAME
DIVIDEND PROPERTY
STREET_NUMBER
13170
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
13170 W GRANT LINE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TL 492-0181-01 Page 2 <br /> The scope of our field investigation .is as follows: <br /> o Drill three test borings to a minimum of 25 feet below <br /> site grade (BSG) . <br /> o Conduct standard penetration ' tests and retrieve <br /> undisturbed shelby tube samples. <br /> o Measure groundwater depth. <br /> o Backfill borings with bentonite chips and neat cement. <br /> i <br /> The scope of our field and laboratory investigation does not <br /> include the analysis of soil or groundwater samples for petro- <br /> chemicals or any chemical constituents. <br /> The soils are being investigated for a proposed 72-inch <br /> diameter pipeline that will be placed so that the existing canal <br /> can be backfilled. The existing canal is about 11 feet deep and j <br /> contains about 2 feet of water at the present time. The proposed <br /> i <br /> pipeline will be placed at a depth of about 17 feet below site <br /> I <br /> grade. The intent of our investigation is to provide design and <br /> construction recommendations for the pipeline. <br /> Drilling Procedures <br /> The test borings will be drilled using a CME-75 drill rig <br /> provided by The Twining Laboratories, Inc. (Twining) equipped with <br /> 6-5/8 inch outside diameter (O.D. ) hollow stem auger. Drilling <br /> i <br /> operations will be under the direction of a Twining staff engineer. <br /> The soils encountered in the test borings will be logged. <br /> Standard penetration tests will be conducted, and both <br /> disturbed and undisturbed soil samples will be obtained. Standard <br /> penetration tests will be conducted at depth intervals of 5 feet. <br /> Fresno Modesto Visalia Bakersfield <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.