My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
13880
>
2900 - Site Mitigation Program
>
PR0508216
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 3:26:24 PM
Creation date
1/24/2020 3:16:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508216
PE
2960
FACILITY_ID
FA0007997
FACILITY_NAME
MANSFIELD PROPERTY
STREET_NUMBER
13880
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20927030
CURRENT_STATUS
02
SITE_LOCATION
13880 W GRANT LINE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHEVRON EMC j ` ?58420213 09/19 '00 "x:58 N0.075 03/10 <br /> Mr. Robert D. Mihalovich - 2 - 3 August 2000 <br /> Thompson Chevrolet, Patterson, Stanislaus County <br /> Chevron proposes to install a boring north of MW 3, west of MW 6, east of MW 1, and sou.tb,east of <br /> MW 1, in,response to my 1.4 March request to d.ef.ne,th.e lateral extent of TPHd pollution in.these areas_ <br /> Chevron proposes to install the bori.n.g north.of MW 3 at least 230 feet rno.rtb.of MW 3 and outside the <br /> footprint of TPH-affected. soil. This location.seems too far, Another boring shouldbe placed.mi.d.wa.y <br /> between.MW 3 and.the proposed location. The boriaag east of MW I sh.ou.l.d be moved approximately <br /> 80 feet to the n.ortbwest,just outside the T.P14-affected soil footprint. The proposed. Location is too far <br /> from the TPH-affected. soil footprilit,and would, likely show.non.detectable.levels. The work plan, is <br /> approved provided that the above comments are incorporated i.n.to the work plan. Staff may request <br /> Chevron to install permanent MWs to confirm results fromth.i.s i.nvcsti.ga.ti.on. <br /> Schedule <br /> The work plans state that depen-ding on,the availability of contractors, the fieldwork,would.be sch.ed.u.led. <br /> within two weeks of staff approval midexecution.of right of entry a.greem.en.ts between. Cli.evron.and <br /> property owners. Basedon.this schedule,by 1.8 August 2000, please submit a. schedule for <br /> im.plem.enta.ti.on of the work plans. If you have any questions, you may callme at(91.6) 255-3081. or <br /> e-Pail. at isoren.p@rb5s.swrcb.ca.gov. <br /> i <br /> PHff-IPvS. ISOUNA <br /> -�. <br /> Associate Engi.n.eer <br /> cc: Ms. Margaret Lagori.o, San.Joaquin County Public Health.Services, Stockton <br /> Mr, James Simpson, Stan.i.slaus County Department of Environmental Resources,Modesto <br /> Ms. Penny Fottrel.l, Chevron,Environmental Management Company, San.Ra.m.on. <br /> II <br /> i <br /> i <br /> i <br /> i <br /> I <br /> i <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.