Laserfiche WebLink
APPENDIX A <br /> Storm Water Detention Basin Groundwater Monitoring Well <br /> SITE SAFETY PLAN <br /> 2.0 HAZARD INFORMATION <br /> Materials: None anticipated <br /> Route to body entry: N/A <br /> Potential environmental hazards: N/A <br /> ' Potential hazards: Associated with operation of heavy equipment <br /> (e.g., drilling rig) <br /> ' First Aid: First Aid Kit available in company vehicle. Minor <br /> first aid performed at site. Primarily visit hospital of <br /> call 911. <br /> Exposure limits: N/A <br /> ' Site monitoring equipment: Visual <br /> Heat stress conditions: Partial shade available, drink a cup of cool water <br /> every 15 minutes, take breaks as needed <br /> Dust monitoring: Visual <br /> ' Suspend operations: When unsafe conditions are encountered <br /> (e.g., lightning) <br /> Injury Illness Prevention Plan: Subcontractors IIPP will be referenced when <br /> necessary <br /> .� Page 3 of 5 <br /> WALLACE•KUHL <br /> I,ASSOCIATES INC. <br />