Laserfiche WebLink
Pn _ <br /> - c <br /> Clayton <br /> 4.0 ONSITE ORG4NIZATION AND COORDINA'1ION <br /> Project Leader. Sarni Malaeb <br /> Site Safety Manager: Tom Ramsey <br /> Field Team Leader: Tom Ramsey <br /> Field Team i'vtembers: <br /> Contractor Representative: Tom Ramsey <br /> The Fuel Oil Polishing Company <br /> 19336 Solano Court <br /> Scnoma, CA 95476 <br /> Telephone: (707) 935-1700 <br /> Mobile Telephone. (415) 265-2034 <br /> Site Supervisor: Sarni Malaeb <br /> Clayton Environmental Consultants, Inc. <br /> 1252 Quarry Lane <br /> Pleasanton, CA 94565 <br /> Telephone: (415) 426-2624 <br /> Beeper: (415) 727-7289 <br /> All activities onsite must be cleared through the project team leader. <br /> 5.0 ONSITE CONTROL <br /> Mr. Tom Ramsey of Fuel Oil Polishing has been designated to coordinate access <br /> control and security onsite. A safe zone has been established at a distance of 10 <br /> feet around the work area (Figure 2). Work area will be barricaded with tape <br /> and fenced overnight. <br /> 6.0 HAZARD EVALUATION <br /> - - .6.1 CIIEMICAL HAZARD <br /> According to the laboratory analysis of soil samples from this site, the possible <br /> contaminants to be encountered during the soil excavation are petroleum <br /> oil and grease. <br /> hydrocarbons as gasoline (gasoline) benzene, toluene, ethylbenzene, xylene, and <br /> -' Inhalation and skin absorption present the main exposure hazards. Based on the <br /> laboratory analysis of.the soil, we do not anticipate that the potential levels of <br />