My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012706
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
8715
>
3500 - Local Oversight Program
>
PR0545215
>
ARCHIVED REPORTS_XR0012706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 5:23:04 PM
Creation date
1/24/2020 4:48:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012706
RECORD_ID
PR0545215
PE
3528
FACILITY_ID
FA0005583
FACILITY_NAME
CARDOZA, TONY ET AL
STREET_NUMBER
8715
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
8715 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
556
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br /> l <br /> i <br /> KAPRE.ALQAN ENGINEERING, INC. <br /> Consulting Engineers <br /> 535 Main Street <br /> Martinez,Ca.94553 <br /> (415)372-5444 CIS';; <br /> KEI-Pc6-032A <br /> August 11, 1986 <br /> mr. Tony Cardoza <br /> 4451 E. Perrin Road <br /> Manteca, CA 95336 <br /> Re: Groundwater Monitoring and Sampling wells <br /> at 8715 W. Grantline Road 7racy, CA <br /> Dear Mr. Cardoza: <br /> This report preseints our investigation for monitoring <br /> groundwater in accordance with our proposal dated April 15, 1936, <br /> for the referenced site. The purpose of the investigation was to <br /> make an assessment of the vertical extent of possible <br /> contamination of soil and groundwater beneath the subject site due <br /> following; <br /> to gasoline spill. The work performed consisted of the <br /> 1. Coordination with the regulatory agencies for <br /> installation of the wells. <br /> 2. Drilling and groundwater well installation. <br /> 3 . Groundwater purging/sampling. <br /> 4. Laboratory analysis. <br /> 5. Data analysis, interpretation and report preparation. <br /> FIELD INVESTIGA'T'ION PROCEDURES <br /> One 2-inch monitoring well was installed on the site on June <br /> 10, 1936 which was designated as MW-1. The well was drilled and <br /> completed in accordance with the guidelines of the California <br /> Regional Water Quality Control Board. <br /> , A description of the subsurface materials penetrated and <br /> details <br /> ...of....the...construction- of-the-:wells are contained on the <br /> accompanying. Exploratory Boring Logs. <br /> Ad <br /> �r <br />
The URL can be used to link to this page
Your browser does not support the video tag.