Laserfiche WebLink
CERS Consolidated Emergency Response/Conrtnaency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR WILL OCCUR BY(Check all that apply): C11. <br /> (j] 1.VERBAL WARNINGS; ❑2.PUiILi ADii;<L,S 1?:NTERCONI SYSTEM; ❑3.TELEPHONE: <br /> ❑4.PAGERS; ❑5.A! R*:':S`.''; T'i;, ❑6.PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE "1 E TED EVAN OFF-SITE RELEASE WILL OCCUR BY(Check all that apply): C12 <br /> E L VERBAL WARNINGS; [12,PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑3.TELEPHONE; <br /> ❑4.PAGERS; ❑5.ALARM SYSTEM; ❑6.PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: C13. <br /> PRIMARY EMERGENCY COORDINATOR NAME. Mike Belmont PHONE NO.: (209)601-0363 PHONE NO.: <br /> ALTERNATE EMERGENCY COORDINATOR NAME: Kishore Dupally PHONE NO.: (316) 573-6873 PHONE NO.: <br /> ❑Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br /> Note:If more than one alternate emergency coordinator is designated,attach a list in order of responsibility. <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate your facility's rocedures for containing spills and preventingg d mitigating releases,fires and/or explosions. <br /> -- - DI. <br /> Q 1. MONITOR FOR LEAKS,RUPTURES,PRESSURE BUILD-UP,ETC.; <br /> 2. PROVIDE STRUCTURAL PHYSICAL BARRIERS(e.2,Portable spill containment walls,built-in berms): <br /> ❑� 3. PROVIDE ABSORBENT PHYSICAL BARRIERS(e.g.,Pads,spill pigs,spill pillows), <br /> 4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> ❑ <br /> S. LINED TRENCH DRAINS AND/OR SUMPS; <br /> ❑6. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> [j]7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> E 8. STOP PROCESSES AND/OR OPERATIONS, <br /> 0 9. AUTOMATIC/ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> 10.SHUT OFF WATER,GAS,ELECTRICAL UTILITIES; <br /> Q 11.CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> Q 12.NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> F-1 13.ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> E 14.PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> Q IS.REMOVE CONTAINFRS AND/OR ISOLATE AREAS; <br /> 16.HIRE LICENSFD lIA7.^R')0"S RAS <br /> 17.USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> ❑18.VACUUM SUCTION USING APPROPRIATE VACUUM(e.g.,Intrinsically safe)FOR SPILL CONTROL AND/OR CLEANUP; <br /> ❑ 19.DECONTAMINATE PERSONNEL AND EQUIPMENT Wl i'HIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> ❑20.PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> ❑21.OTHER(Specify): <br /> D2. <br /> E. FACILITY EVACUATION . <br /> THE FOLLOWING ALARM SIGNAL(S)WILL BE USED TO BEGIN EVACUATION OF THE FACILITY(Check all that apply): F1 <br /> ❑ 1. BELLS; E2 <br /> [12. HORNS/SIRENS; <br /> El 3. VERBAL(i.e.,Shouting); <br /> [14. OTHER S ecifk l <br /> THE FOLLOWING LOCATION(S)WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S)(e.g.,Parking lot,street comer): 1:3. <br /> Parking lot <br /> Note:The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: 1 <br /> ❑ 1.WRITTEN PROCEDURES DESCRIBING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> 2 EVACUATION MAP(S)DEPICTING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> [13. OTHER(Specify): rs <br /> Note:Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan. <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES(Check one of the following): I=� <br /> I. HAVE BEEN DETERMINED NOT NECESSARY; <br /> ❑2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE(Specify): F2 <br /> Note:Advance arrangements with local fire and police departments,hosp;tals,state and loc;a emergenc}response teams,and/or emergency services <br /> contractors should be made for your facility,if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev.03/07/17 Page 2 of 4 <br />