Laserfiche WebLink
C.la% ton <br /> 4 0 QNSIIE ORC4NIZATION AND COORDINATTON <br /> Protect Lewder: Sami Malaeb <br /> Site Safety Manager. Tom Ramsey <br /> Field 'Team Leader: Tom Ramsey <br /> Field i.am Members: <br /> Contractor Representative: Tom Ramsey <br /> The Fuel Oil Pohshing Compiny <br /> 19336 Solano Court <br /> Sonoma, CA 95476 <br /> Telephone (707) 935-1700 <br /> Mobile Telephone (415) 265-2034 <br /> Site Supervisor: Sami Malaeb <br /> Clayton Environmental Consultants, Inc <br /> 1252 Quarry Lane <br /> Pleasanton, CA 94565 <br /> Telephone (415) 426-2624 <br /> . Beeper (415) 727-7289 <br /> All acuvities onsite must be cleared through the project team leader <br /> 50 ONSITE CON27ROL <br /> Mr Tom Ramsey of Fuel Oil Polishing has been designated to coordinate access <br /> control and security onsite A sate zone has been established at a distance of 10 <br /> Leet around the work area (Figure 2) Work area will be barricaded with tape <br /> and fenced overnight <br /> 6.0 HAZARD FVALUA31ON <br /> 61 CHEMICAL HAZARD <br /> I <br /> According to the laboratory analysis of soil samples from this site, the possible <br /> contaminants to be encountered during the soil excavation are petroleum <br /> hydrocarbons as gasoline (gasoline) benzene, toluene, ethylbenzene, xylene, and <br /> oil and grease <br /> Inhalation and skin absorption present the main exposure hazards Based on the <br /> laboratory analysis of the soil, we do not anticipate that the potential levels of <br /> -2- <br /> 1v5)1 ni REP <br />