Laserfiche WebLink
r./ <br /> ❑❑� <br /> GROUNDWATER <br /> EIEIEI� TECHNOLOGY, INC. 4057 Port Chicago Highway.Concord,CA 94520(425)671-2387 <br /> FAX:(415Y685-9148 <br /> May 3, 1993 <br /> Mr. Alfred Pena <br /> 455 Grant Line Road <br /> Tracy, California 95376 <br /> SUBJECT: FORMER SUPER-7 STATION NO. 29njy, , <br /> 455 GRANT LINE ROAD f •,o +'j,'I t= '�� �� <br /> TRACY, CALIFORNIA <br /> FIELD ACTIVITIES: GROUNDWATER EXTRACTION WELL INSTALLATION <br /> Dear Mr. Pena: <br /> This letter serves as notification that the above referenced field activities are scheduled to be conducted <br /> beginning May 7, 1993. Groundwater Technology, Inc. will direct the installation of one well <br /> accomplished using a truck-mounted drill rig. Drilling will be conducted at a location within the planter <br /> to the east of the store front. The well will be Installed with a secured well cover. A temporary barricade <br /> will be placed over the location until the cement has set (approximately 48 hours). All the field activities <br /> will be completed by Friday, May 14, 1993. <br /> Drilling will create waste soil and water that will be stored temporarily on the site property until results of <br /> the chemical analysis are available (estimated one week). The results will allow us to determine the <br /> proper method of disposal of these materials. The water will be sealed in labeled 55-gallon drums. We <br /> propose to stockpile the soil on the site. This will require an area approximately 8 feet by 8 feet. The <br /> soil will be laid down on plastic sheeting and covered until disposed is arranged. The Groundwater <br /> Technology site geologist will verify with you the location for the temporary waste storage on Friday, <br /> May 7, 1993. <br /> Groundwater Technology will make ever effort to minimize the impact of our work on your operations. If <br /> you have any questions, please call me at (510) 671-2387. <br /> Sincerely, <br /> Groundwater Technology, Inc. Groundwater Technology, Inc. <br /> Written/Submitted by Reviewed/Approved by <br /> Michael am a ain I—a—nd—raE Lindsey <br /> Lead Geologist Project Manager <br /> cc: Mr. Bob Vasquez, Southland Corp., 5820 Stoneridge Mall Rd, Ste 310, Pleasanton, CA 94566 <br /> Mr. Craig Pichinino, Market Manager, 3146 Gold Camp Dr, Ste 300, Rancho Cordova, CA 95670 <br /> Ms. Mary Meays, SJCPHS, 455 N. San Joaquin Street, Stockton, CA 95201 <br /> Offices throughout the U.S.,Canada and Overseas <br />