My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012703
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
455
>
3500 - Local Oversight Program
>
PR0545202
>
ARCHIVED REPORTS_XR0012703
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 10:29:37 AM
Creation date
1/27/2020 9:43:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012703
RECORD_ID
PR0545202
PE
3528
FACILITY_ID
FA0003124
FACILITY_NAME
7-ELEVEN INC. STORE #20304
STREET_NUMBER
455
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
455 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
354
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mon—mv <br /> MEMO <br /> Harding Lawson Aswwistes <br /> r. borings to avoid cross-contamination. At the completion of drilling, the bor- <br /> ings were sealed to..the ground surface with a cement/bentonite grout. <br /> Qualitative ground-water saiTples ("grab samples") were collected from <br /> Borings 2 through 4; 6, and 7. The borings were extended approximately two <br /> feet below the water table, allowed to come to equilibrium overnight, and then <br /> were checked for free product. Subsequently, water samples were collected. <br /> Upon completion of the borings for Monitoring Wells MW-6, MW-7, and MW-8, <br /> we commenced well construction ope;-ations. We installed 2-inch-diameter <br /> Schedule 40 PVC well casing at MW-6 and 4-inch-diameter casing at MW-7 and <br /> i ! MW-8. The tops of the wells were completed slightly below the ground surface <br /> '- and secured with locking metal well.covers. Each well was equipped with a <br /> 9 water-tight cap to minimize intrusion of surface water. All wells were <br /> installed in accordance with the construction standards outlined in our <br /> letter, "Application for Well Permits," dated December 15, 1987, which was <br /> V submitted to the SJLHI (Appendix A). These,standards comply with those set by . <br /> the California Regional Water: Quality Control Board (RWQCB). Plates 9 through <br /> 11 illustrate construction details for the three rr:ew wells. <br /> HLA developed MW-6 through MW-8 on.January 5, 1988. The wells were bailed <br /> until the water became clear. The bailed water was monitored for phi, conduc- <br /> tivity, and temperature. When these parameters stabilized, the wells were <br /> sampled with a stainless steel bailer, and-the water was decanted into vola-. -- - <br /> the organic analysis (VOA) vials. Water discharged from the wells during , <br /> development and puxging was collected and stored in 55-gallon drums for proper <br /> rGO-1 <br /> ►�: `disposal. Ground-water samples were stored'in a cooled ice chest. Both sail <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.