Laserfiche WebLink
P <br /> t <br /> F <br /> San Joaouin River would requireobtaining a �}?dES Hardinpl. wsonAsmaciates <br /> permit from the StGte <br /> (estimated processing time,—three to six months). Discharging into a Westside <br /> Irrigation District canal would involve discussions with District officials. <br /> We:,understand that the Westside`Irrigation District is currently accepting <br /> treated dischanoe.water with.gasoline_canstituents. Preliminary discussions <br /> with Mr, Robert Sagaser of the City of Tracy's waste water treatment plant <br /> indicate a considerable reluctance to accept any additional water into the E <br /> sanitary f <br /> fE rY sewer system. <br /> t t <br /> j <br /> y <br /> F <br /> N. <br /> 14 <br /> f <br />