Laserfiche WebLink
1: UP _ _ o _ _ <br /> MM-21 E <br /> I <br /> Harding Lawson Associates <br /> f i III FIELD OPERATIONS <br /> ` I <br /> } <br /> " Field operations consisted of bailing the two existing inspection wells <br /> (MW-A.and MW-B), obtaining well permits from the SJLHD, drilling and sampling <br /> tour borings near the property corners, installing and developing four <br /> monitoring wells, and sampling the wells. <br /> On November 11, 1986, HLA purged MW-A and MW-B by bailing with a clear <br /> Zucite bailer. Each well was bailed dry Your times. As shown in Table 1! <br /> floatirry produ::t was noted in each well. All water removed from the wells was <br /> stored in drums and left on site. <br /> Table 1. Water and Free Product <br /> n Removed From-e.,W-A and MW-B <br /> a - � <br /> [umber:of Average Amount <br /> t " <br /> Monitoring: Well Volumes of Free Product <br /> Well Removed*. in Bailer.(inches) ' <br /> { , A 1 1/36' <br /> 2 1/16 € <br /> 3 <br /> 1/16 <br /> t r t L 4 1/16 <br /> B 1 3-1:2 <br /> a s 1M-IHE a - <br /> a 3 1 <br /> 4 3/4** <br /> 3 <br /> * The wells;; ere bailed dry..in each volume, and there was a 20 s <br /> +, minute recharge time between Volume 3 and 4. 3 <br /> N First bailer , <br /> a <br /> q t *+ last bailer . , <br /> h <br /> IL4'_ 3 <br /> 4 J <br /> Rt1�nr' <br />