My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012703
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
455
>
3500 - Local Oversight Program
>
PR0545202
>
ARCHIVED REPORTS_XR0012703
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 10:29:37 AM
Creation date
1/27/2020 9:43:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012703
RECORD_ID
PR0545202
PE
3528
FACILITY_ID
FA0003124
FACILITY_NAME
7-ELEVEN INC. STORE #20304
STREET_NUMBER
455
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
455 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
354
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br /> 1 <br /> Warding Lawacn Associates <br /> VII. RECOMMENDATIONS <br /> on the basis of our review of all data and the evaluations <br /> z iA performed in the feasibility study, HLA presents the following <br /> recommendations for soil and ground-water remediation. <br /> A. Ground Water <br /> HLA recommends the installation of a series of active hori- <br /> zontal extraction drains for the control and removal of ground <br /> water containing gasoline hydrocarbons. This drain system would <br /> ! be installed near the surface of the water table below the soil- <br /> f: <br /> s ff venting.systen. A surface suction pump will assist in the devel- <br /> opment of a drawdown zone. Both the soil-venting and ground- <br /> {. <br /> water extraction systems would beplaced in .the same trench, The <br /> s development of a drawdown zone would not only assist in capturing I <br /> and removing water in which gasoline hydrocarbons_ are.present, <br /> 6.r but it. would alsfl help prevent ground water from being drawn up � <br /> Li into the soil--venting system during its. operation. Water gener- . <br /> # aced during the operation of the horizontal extraction system <br /> will either be disposed of off-site without any prior treatment <br /> rl � or treated on-site with activated carbon and then discharged into <br /> the storm sewer :system. The choice of.a water treatment`alterna- <br /> s tive will be made during the initial system start-up when the <br /> quantity of water actually generated can be more accurately ' <br /> u y� <br /> determined <br /> 21 <br /> MA <br /> G.v.5- ...' ...'.:- _....�... ..:. <br />
The URL can be used to link to this page
Your browser does not support the video tag.