Laserfiche WebLink
Ms. Emily Cushman <br /> September 12, 2016 <br /> neat cement in the wells, extending to surface. The surface at each well location will be restored to match <br /> existing conditions. <br /> Investigation Derived Waste <br /> Waste material from subsurface sources, generated during well destruction activities including soil <br /> cuttings and well debris will be placed in California Department of Transportation-approved 55-gallon <br /> drums or roll-off bins. The drums will be appropriately labeled and temporarily stored on site pending <br /> characterization and disposal. The drums will be removed by an approved disposal contractor and <br /> transferred to an appropriate disposal facility. Waste material from surface sources, such as asphalt, <br /> concrete, well boxes and former system components shall be treated as construction debris and disposed <br /> of as such. Where available, construction debris will be recycled. <br /> Reporting and Schedule <br /> Arcadis is prepared to initiate field work after receipt of all necessary approvals and permits. Based on the <br /> access agreement between EMC and the property owner(Target Corporation), no field work can be <br /> conducted between November 1St and January 101h. A summary report describing well decommissioning <br /> activities will be submitted to Central Valley Regional Water Quality Control Board within 60 days of <br /> completing field activities. <br /> If you have any questions regarding the contents of this work plan addendum, please contact Tamera <br /> Rogers at phone(408.797.2013)or email (Tam era.Rogers@arcadis-us.com). <br /> o41M ��la <br /> C <br /> Sincerely, � �32 �'�' <br /> " � <br /> eoh7ts <br /> Arcadis U.S., Inc. 3/;r�,U1g <br /> CFCAU�Q <br /> �C1Ali►•� ted <br /> Tamera Rogers Katherine Brandt, P.G. <br /> Project Manager Senior Geologist <br /> Copies: <br /> James Kiernan, EMC (electronic upload) <br /> Ed Ralston, Phillips 66 Company(electronic upload) <br /> Target Corporation, Target Property Development,Attn: Real Estate Portfolio Management/T- <br /> 2238/Stockton, CA— 1000 Nicollet Mall, TPN-12H, Minneapolis, MN 55403(with an additional copy via <br /> email to construction.environmental@target.com) <br /> arcadis.com Page: <br /> E:\Projects\76PP Project Folders\351515-Stockton\5 Deliverables\Work Plans\351515 Work Plan Addendum_FINAL_091216.docx 3/4 <br />