Laserfiche WebLink
Table 1 <br /> Well Construction Details <br /> 4707 Pacific Avenue Stockton, California <br /> Date Casing Construction Current Well Current Depth to Screen <br /> Well ID Well Type Diameter Well Depth Depth Groundwater Interval (feet <br /> Installed inches feet b s feet b s feet below TOC b s <br /> MW-15 8/18/1999 Monitoring 2 1 38.00 37.57 2 26.72 2 18-38 <br /> VW-4 3/10/1992 Extraction 4 ' 50.50 36.50 3 27.25 3 25.5-50.5 <br /> SP-1 11/19/2001 Sparge 0.75 65.00 --4 --4 62-65 <br /> SP-2 11/19/2001 Sparge 0.75 65.00 --4 --4 62-65 <br /> SP-3 11/19/2001 Sparge 0.75 65.00 --4 --4 62-65 <br /> SP-4 11/19/2001 Sparge 0.75 65.00 --4 --4 62-65 <br /> SP-5 11/19/2001 Sparge 0.75 65.00 --4 --4 62-65 <br /> SP-6 11/20/2001 Sparge 0.75 65.00 --4 --4 62-65 <br /> SP-7 11/20/2001 Sparge 0.75 65.00 --4 --4 62-65 <br /> SP-8 11/20/2001 Sparge 0.75 65.00 --4 --4 62-65 <br /> SP-9 11/20/2001 Sparge 0.75 65.00 --4 --4 62-65 <br /> SP-10 11/20/2001 Sparge 0.75 65.00 --4 --4 62-65 <br /> SP-12 11/20/2001 Sparge 0.75 40.00 --4 --4 37-40 <br /> SP-13 11/19/2001 Sparge 0.75 40.00 --4 --4 37-40 <br /> Notes: <br /> bgs=below ground surface <br /> TOC=top of casing <br /> 1 =As reported in TRC Solutions August 2011 field data sheets. <br /> 2 =As measured prior to groundwater sampling on 5/25/12. <br /> 3=As measured prior to groundwater sampling on 1/17/12. <br /> 4=Not measured. <br /> 351515_Work Plan Addendum-Table 1.xlsx Arcadis Page 1 of 1 <br />