Response to DTSC Comments <br /> Operations and Maintenance Plan <br /> March 9,2017 <br /> Page 3 of 4 <br /> Comment Comment Response <br /> No. <br /> Section 9.4.2 Excavation Procedures.The term <br /> "RAW"should be defined and a reference to The first use of RAW has been defined in Section <br /> Comment where the RAW can be found should be added to 1.0 as well as the first use in Section 9.4.2. <br /> 10 the text.Alternatively,the requirements of the Footnotes have been added with web hyperlinks to <br /> Air Monitoring Plan can be repeated in the Plan document locations on Envirostor. <br /> appendices. <br /> Section 9.4.2 Excavation Procedures.The fourth Section 9.4.2 Excavation Procedures.The <br /> sentence states that excavation areas will be sentence in question now reads: Prior to <br /> sprayed with enough water to minimize dust commencement of excavation activities, <br /> Comment generation.The text should be modified to excavation areas will be sprayed with enough <br /> 11 include limiting the amount of water used for water to minimize dust generation as necessary <br /> dust suppression so as not to transport but will be limited such that contaminated soil is <br /> contaminated soil from the excavation area not transported through runoff or other means. <br /> through runoff or other means. <br /> Section 9.7 Reporting Requirements.The last Section 9.7 Reporting Requirements. The sentence <br /> Comment sentence regarding updating the Plan and SMP has been modified to read: This SMP and O&M <br /> 12 should be revised to include"and written Plan should be considered a living document and <br /> concurrence by"in addition to consultation with updated when conditions change in consultation <br /> DTSC. with and written concurrence by DTSC. <br /> Appendix D,Quality Assurance Project Plan for <br /> Removal Action.This appendix is meant to <br /> serve as a quality assurance project plan for <br /> sampling related to the operations and Appendix D, Quality Assurance Project Plan for <br /> maintenance phase of the remedy. Sections 1-3 Removal Action. Appendix D has been removed <br /> Comment refer to the original excavation project and are from the Plan as the information is already <br /> 13 not relevant to operation and maintenance included in the main text of the Plan. Additional <br /> activities for the encapsulation area.These language has been added to Section 9.5. <br /> sections should be revised to reflect the current <br /> project(maintenance of the implemented <br /> remedy).We note that most of this information <br /> is already included in the main text of the Plan. <br /> �.M� CONDOR <br />