Laserfiche WebLink
Final Operations and Maintenance Plan <br /> Neighborhood C,Great Valley Parkway <br /> Mountain House,San Joaquin County,CA <br /> Page 1-2 <br /> confirmation samples confirmed that the cleanup goal had been achieved. The soil remediation activities <br /> were complete and DTSC concurrence and approval to proceed with mass grading in the remediated area <br /> was obtained on November 25, 2013. Approximately 70,000 cubic yards of dieldrin-impacted soil were <br /> ultimately removed and placed beneath the southbound lanes of Great Valley Parkway. <br /> %L4 <br /> �� CONDOR <br />