Laserfiche WebLink
i <br /> 10 . 0 SCHEDULE <br /> On a weekly basis, ASE will continue to: <br /> i <br /> • Visit the site to maintain the remediation equipment and perform <br /> programming adjustments and repairs as necessary; <br />{ • Measure the DO in the six groundwater monitoring wells; <br /> Collect and analyze groundwater samples as scheduled in the workplan; <br /> • Prepare quarterly reports detailing the operation of the remediation <br /> system and the groundwater analytical results. <br /> Should you have any questions or comments, please call us at (925) 820- <br /> 9391 . <br /> Respectfully submitted, <br /> f AQUA SCIENCE ENGINEERS, INC. <br /> t <br /> (avid Allen ED G <br /> Senior Project Manager j� !0 3 <br /> 8386 <br /> ,F <br /> Robert E. Kit , R.G., R.E.A. �i����`�oe��� ` <br /> Senior Geologist <br /> E } <br /> i <br /> r <br /> I <br /> J <br /> i <br /> I <br /> Singh's Unocal System Installation and Operation Report — October 2002 <br /> -6- <br />