My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002248
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
3500 - Local Oversight Program
>
PR0545205
>
ARCHIVED REPORTS_XR0002248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 3:39:19 PM
Creation date
1/27/2020 3:24:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002248
RECORD_ID
PR0545205
PE
3528
FACILITY_ID
FA0003164
FACILITY_NAME
NORTH POLE GAS & FOOD INC
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> %✓ TASK 7 - ANALYZE EACH CAPILLARY ZONE SOIL SAMPLE <br /> One (1) soil sample from each boring will be analyzed at a CAI,EPA <br /> certified analytical laboratory for TPH-G, BTEX, and the fuel oxygenates <br /> MTBE, TBA, TAME, DIPS and ETBE by EPA Method 8260. The soil sample <br /> chosen for analysis will be the soil sample from each boring that appears <br /> to be the iT)ost contaminated based on odors, staining or OVM readings. <br /> 1f there is no indication of contamination in any of the borings; then the <br /> soil sample collected from the capillary zone will he analyzed. <br /> TASK 8 - DEVELOP THE MONITORING WELLS <br /> After waiting at least 72-hours following the well construction, ASE will <br /> develop the new pumping and monitoring wells using at least two episodes <br /> of surge block agitation and evacuation using pumps and/or bailers. <br /> TASK 9 - SAMPLE THE MONITORING WELLS <br /> ASE will collect groundwater samples from the monitoring wells after <br /> waiting at least 72 hours following the development of the monitoring <br /> wells. Prior to purging and sampling, ASE will measure the depth to <br /> groundwater and check for floating product in all site wells prior to <br /> purging water from :.any well. Any monitoring well which contains a <br /> measurable thickness of free-floating product will not be sampled. <br /> Prior to sampling, each well will be purged of at least four well casing <br /> volumes of groundwater. The temperature, pH and electrical conductivity <br /> of evacuated water will be monitored during the well purging. Purging will <br /> continue beyond four well casing volumes if these parameters have n o t <br /> stabilized. Groundwater samples will be collected from each well using <br /> disposable polyethylene bailers. Groundwater will be decanted from the <br /> bailers into 40-m1 glass volatile organic analysis (VOA) vials, preserved <br /> with hydrochloric acid and sealed without headspace. The samples will <br /> then be labeled with the site location, sample designation, date and time <br /> the samples were collected, and the initials of the person collecting the <br /> samples. The samples, will be placed on ice for transport to the analytical <br /> laboratory under chain. of custody. Purged groundwater will be stored on- <br /> site in sealed and labeled 55-gallon steel drums until off-site disposal can <br /> be arranged. <br /> 574 West Grand Line Road, Tracy, CA Workplan — April 2001 <br /> -]0- <br />
The URL can be used to link to this page
Your browser does not support the video tag.