My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002248
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
3500 - Local Oversight Program
>
PR0545205
>
ARCHIVED REPORTS_XR0002248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 3:39:19 PM
Creation date
1/27/2020 3:24:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002248
RECORD_ID
PR0545205
PE
3528
FACILITY_ID
FA0003164
FACILITY_NAME
NORTH POLE GAS & FOOD INC
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- h <br /> site, ASE estimates that the well will be screened between approximately 4 <br /> and 18-feet bgs. The well casing will be lowered through the augers and <br /> #2/12 filter pack sand will be placed in the annular space between t h e <br /> well casing and the borehole from the bottom of the boring to <br /> approximately 1-foot above the screened interval. Approximately 0.5-feet <br /> of bentonite pellets will be placed on top of the sand pack prior to placing <br /> the cement sanitary seal. Since the bentonite sea] will be placed in the <br /> unsaturated zone; the bentonite will be hydrated with potable water prioz- <br /> to placing the cement sanitary seal. Cement mixed ti�iih 3 to 5 percent <br /> bentonite powder by volume will be used to fill the annular space between <br /> the bentonite layer and the surface to prevent surface water from <br /> infiltrating into the well. The seal will be placed by simply pouring the <br /> seal into the boring. The well head will be protected with a locking well <br /> plug beneath an at-grade, traffic-rated well box (See Figure 4 - Typical <br /> Monitoring Well). .. <br /> TASK S -INSTALL AN AIR SPARGING WELL <br /> In order to conduct an air sparging test, an air sparging well will have to <br /> be constructed. This well will be placed near monitoring well MW-2 <br /> �..• (Figure 3). The well will be constructed using a drill rig equipped with 8- <br /> inch diameter hollow-stem augers. The well will be constructed within the I <br /> hollow stem augers using 2-inch diameter flush-threaded, schedule 40, <br /> 0.020-inch slotted PVC well screen and blank casing. The well will be <br /> screened between approximately 14 and 16-feet bgs. The well casing will <br /> be lowered through the augers and #2/12 filter pack sand will be placed <br /> in the annular space between the well casing and the borehole from the <br /> bottom of the boring to approximately 1-foot above the screened interval. <br /> Approximately 0.5-feet of coated bentonite pellets will be placed on top <br /> of the sand pack prior to placing the cement sanitary seal. Cement mixed <br /> with 3 to 5 percent bentonite powder by volume will be used to fill the <br /> annular space between the bentonite layer and the surface to prevent <br /> surface water from infiltrating into the well and to prevent conduits for + <br /> the migration of contamination from shallow groundwater into deeper 1� <br /> zones. The cement seal in this well will be placed using a tremie pipe. <br /> The well head will be protected with a locking well plug beneath an at- <br /> grade, traffic-rated well box (See Figure 5 - Typical Air Sparging Well). <br /> TASK 6 - DRILL TWO SOIL BORINGS TO APPROXIMATELY 6-FEET BGS AND <br /> CONSTRUCT VAPOR EXTRACTION WELLS IN's BORINGS <br /> ASE will drill two soil borings to approximately 6-feet bgs at the site using <br /> a drill rig equipped with 8-inch diameter hollow stem augers (Figure 3). <br /> 574 West Grand Line Road, Tracy, CA Workplan — April 2001 <br /> -8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.