Laserfiche WebLink
JOB NAME 7-Eleven Store#32262 JOB NUMBER 77EL 32262 03 0701 <br /> SITE ADDRESS 2360 West Grant Line Road START DATE o <br /> Tracy, CA DATE PREPARED 10/17/03 <br /> PREPARED FOR Tom Miller PREPARED BY Brian Care <br /> WORK REQUEST FORM <br /> 1) Arrive at site- Review(1) HASP, (2)work order,then call Brian Carey in Sacramento <br /> Check in with 7-Eleven store manager Store Phone (209)830-9917, Franchisee Jivtesh Gill <br /> 2) Measure DTW& DTB in the wells prior to development(Should beapprox 10'bgs) _ <br /> Note calibration readings for D O meter and take D O readings in bucket with agitated water <br /> (Note if any wells have measurable thickness of product, visually inspect with bailer) <br />— _ 3)- Meet Cascade_Dnlling onsite at8 00 AM They will provide a well development rig <br /> Y surging purging <br /> Develop the well b sur m and10 well volumes to remove sediment <br /> Be sure all sediment is removed from the bottom of the well using Cascade's bailers <br /> Surge well casing with the bailer during bailing <br /> 4) Transfer water into empty_drums and retain drums on-site Please note how many drums you filled and the total <br /> 9 9 p ivity,temperature and <br /> number of drums on-site before leaven Dunn development, measure&record H conduct <br /> turbidity of the purge water for each well volume removed <br /> After allowing each well to recover to at least 80%, collect water samples using a disposable bailer <br /> 6) Place all purge water in 55-gallon drums and store onsite Be sure to properly label drums <br /> Note contents of drums on field notes Note location of drums on attached site ma <br /> 7 Call Jaff Auchterlonie in Sacramento before you leave the site <br /> 8 Fill Out E us ment Billing Sheet for all equipment used on the job and attach with field notes <br /> 9 Give copies of all notes and COC's to Bnan Carey,ASAP <br /> 10 Bill Travel time to 77EL 32262 03 0711. 3 hours <br /> Bill labor time to 77EL 32262 03 0701 6 hours <br /> Imam <br /> Health&Safe Site Plan is onsite <br /> Grunfos Pump System,Trash Pump, pHfTemp/Cond Meter, DO Meter, Disposable Bailers,COC's, drum labels, etc <br /> 12",9116', and 15116"sockets,and other misc tools <br /> Direct all questions to Jaff Auchterionte, 916 861-0400 ext 223-office <br /> PROJECT MANAGER,Jaff Auchterlonie AUTHORIZATION <br /> r <br />