My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002167
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
5431
>
3500 - Local Oversight Program
>
PR0545212
>
ARCHIVED REPORTS_XR0002167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 4:58:30 PM
Creation date
1/27/2020 4:36:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002167
RECORD_ID
PR0545212
PE
3528
FACILITY_ID
FA0025705
FACILITY_NAME
PETRIG SEED
STREET_NUMBER
5431
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
BANTA
Zip
95304
APN
21317047
CURRENT_STATUS
02
SITE_LOCATION
5431 W GRANT LINE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5431 Grant Line Road, Banta, California April 7, 1994 <br /> 40 Chevron USA Products Company Page 1 <br /> 1.0 INTRODUCTION <br /> This report is submitted by Groundwater Technology, Inc to summarize the methods and results of <br /> additional environmental assessment work conducted at the former Signal Oil service station #221-5 <br /> located at 5431 Grant Line Road in Banta, California (Figures 1 and 2) Three sod borings were drilled to <br /> define the extent of hydrocarbon-impacted sod and groundwater in the vicinity of the former <br /> underground storage tanks (USTs) Two of the three borings were drilled to accommodate installation of <br /> temporary groundwater monitoring wells TW-1 and TW-2 (Figure 2) In addition to drilling, the work <br /> scope included sod and groundwater sampling, laboratory analysis of selected sod and groundwater <br /> samples, and preparation of this report <br /> This report summarizes the work steps completed at the site January 5 and 6, 1994, as outlined in <br /> Groundwater Technology's Work Plan for Soil and Groundwater Assessment, dated October 25, 1993, <br /> accepted by the San Joaquin County Public Health Services, Environmental Health Division <br /> (SJCPHS-EHD) <br /> LJ'-'W GROUNDWATER <br /> 4894cna RPT � 1'1 TECHNOLOGY <br />
The URL can be used to link to this page
Your browser does not support the video tag.