Laserfiche WebLink
' •t <br /> a <br />' 18 September 2003 <br /> AGE-NC Project No 95-0111 <br />' Page 4 of 4 <br /> S.O. RECOMMENDATIONS <br /> Based on the findings of the second quarter 2003 monitoring event, AGE recommends <br />' • Continued quarterly monitoring,the next monitoring event is scheduled for September 2003 <br /> • Preparation of a closure summary report for the Grant Line Gas and Food Site <br />' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br />' environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site for the purpose of this investigation were made from a limited number of <br />' available data points (i e ground water monitoring well samples) and subsurface conditions may <br /> vary away from these data points No other warranty, expressed or implied, is made as to the <br /> professional interpretations, opinions and recommendations contained in this report <br /> f <br /> I <br /> I <br /> I <br /> • <br /> Advanced GeoEnvironmental Inc <br />