Laserfiche WebLink
IQuarterly Report - Third Quarter 2002 <br /> • GRANT LINE GAS & FOOD <br />' 2420 Grant Line Road, Tracy, California <br />' 1.0. INTRODUCTION <br /> At the request of Mr Joe Toste Jr , Advanced GeoEnvironrnental, Inc (AGE), has prepared this <br />' quarterly report for field activities performed at 2420 Grant Line Road,Tracy, California during the <br /> third quarter 2002 The site setting is illustrated in Figure 1 Monitoring well and boring locations <br />' on the site are illustrated in Figure 2 <br /> A detailed summary of previous work performed at the site was presented in the AGE-prepared <br />' documents titled Quarterly Report-March 1996,dated 15 April 1996 and Quarterly Report-March <br /> 1999, dated 10 May 1999 Monitoring and sample data from January 1994 to the present are <br /> summarized in Tables 1 through 3 of this report <br /> I <br /> 2.0. _ PROCEDURES <br />' This report is prepared in accordance with Central Valley Regional Water Quality Control Board <br /> (CVRWQCB)guidelines for investigation of underground storage tank(UST)sites The field work <br />'. was conducted in accordance with San Joaquin County Environmental Health Department (EHD) <br /> guidelines for sampling ground water monitoring wells <br />' 2 1 WELL MONITORING AND EVACUATION <br />' On 19 September 2002, the water levels in monitoring wells MW-1 through MW-8 were measured <br /> relative to the tops of the well casings using a Solinst water level meter After water levels were <br />' measured, each well was evacuated (purged) utilizing a dedicated, disposable plastic bailer, <br /> approximately one to six gallons(a minimum of three casing-water volumes per well)of water were <br /> removed from each well Temperature, pH and conductivity of the purged ground water were <br />' measured at regular intervals using an Oakton water analyzer during purging,the measurements had <br /> stabilized by the end of the purging process Purged water was stored on-site in labeled 55-gallon, <br /> Department of Transportation (DOT)-approved drums Field logs are included in Appendix A <br /> I <br /> 2 2 COLLECTION AND ANALYSIS OF GROUND WATER SAMPLES <br />' Prior to collection of ground water samples, the depth to ground water was gauged in each purged <br /> well to ensure that a minimum of 80%of the initial well volume had recharged Afterwards, water <br />' samples were collected from each well using the dedicated,disposable plastic bailer and transferred <br /> into three chilled 40-m1 volatile organic analysis (VOA) vials containing 0 5 ml 18% hydrochloric <br /> • acid(HCl)as a sample preservative and into one 1-liter amber bottle without a sample preservative <br /> Advanced GeoEnviron mental Inc <br /> 1 <br />