Laserfiche WebLink
5 <br /> 1 25 November 1997 <br /> AGE-NC Project No 95-0111 <br />' Page 4 of 4 <br />' • A Work Plan Addendum has been approved for the installation of an additional monitoring <br /> well east of MW-5 along Grant Line Road AGE recommends securing the necessary city <br /> permits and commencing with the well installation <br /> f • If ground water remediation is required on the site, feasibility testing should be performed <br /> to evaluate various remedial alternatives <br />' • Quarterly monitoring and sampling should continue at the site The next quarterly monitoring <br /> should be scheduled for January 1998, following installation of the additional ground water <br /> monitoring well <br /> I <br />' 5.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br />' ,environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluations of the geologic/hydrogeologsc <br /> • conditions at the site for the purpose of this investigation are made fiom a limited number of <br />' available data points (x a ground water monitoring well samples) and subsurface conditions may <br /> vary away from these data points No other warranty, expressed or implied, is made as to the <br /> professional recommendations contained in this report <br /> I <br /> IAdvanced GeoEnviron mental Inc. <br />