My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002204
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
3500 - Local Oversight Program
>
PR0545209
>
ARCHIVED REPORTS_XR0002204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2020 8:55:53 AM
Creation date
1/28/2020 8:33:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002204
RECORD_ID
PR0545209
PE
3528
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
02
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File No 93342-SGI Page 3 <br /> C. BACKGROUND <br /> The followingchronology ogy of investigative and remedial activities were performed and <br /> reported at the site by the contractors and consultant in charge of the activities <br /> 1 Soil sampling at the location of former product lines and stockpiled soil This <br /> f investigation was conducted on May 20, 1993 by Advance Soil Technology, Inc and the <br /> report was presented on June 2, 1993 The results of this limited investigation indicated <br /> contamination in the soil at the location of the product line trenches <br /> 2 On June 30, 1993 Walton Engineering, Removed three underground storage tanks (two <br /> 7500 gallon, and one 5000 gallon). Soil and groundwater sampling performed at the side <br /> walls and bottom of the excavation revealed contamination in the soil Also, <br /> a groundwater sample collected from the bottom of the excavation revealed <br /> contamination in the grab groundwater sample The results of this investigation was <br /> presented in the Advance Soil Technology, Inc report, File No 93342-TR dated July ✓ <br /> 9, 1993 <br /> 3 On July 13, 1993, a representative of Advance Soil Technology Inc collected soil <br /> samples from the stockpiled soil (generated from tank removal) at the site The results <br /> of this investigation and sampling was presented in our report, File No 93342-NSP <br /> Dated July 19, 1993 <br /> 4 On July 21 and 22, 1993 the stockpiled soil at the site was removed to a new location <br /> at the end of Toste Road for aeration purposes The results of this activity was <br /> presented in our report, File No 93342-RSP dated July 29, 1993 <br /> i <br /> 5 Aeration of stockpiled soil commenced on August 16, 1993 and continued until the <br /> sampling day of September 24, 1993 The results of sampling revealed no detection of <br /> the contaminants in the soil The result of this activity was presented in our report, File <br /> No 93342-ASP dated October 4, 1993 <br /> iADVANCE SOIL TECHNOLOGY, INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.